Topic | Recent |
---|---|
Warehouse lightingEBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Sherri Santellan on Jun 16, 2010, 6:56 pm
Is this credit achievable for a warehouse? The offices certainly can have controls/task lighting. But the majority of the building is high-stack racks and lighting is accomplished with natural... Last reply: David Posada, Mar 14, 2011, 5:52 pm |
|
"Building Completed 1993 or Later" Tab on GraphEBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by April Ambrose on Jan 22, 2010, 12:33 pm
The graph includes a tab for buildings completed in 1993 or later. For such buildings isn't the baseline 120%, as the plumbing system for such buildings was "substantially completed in 1993 or... Last reply: Jason Franken, Mar 14, 2011, 5:40 pm |
|
Recyclables + Sensitive Paper Estimate?EBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Paul C on Mar 4, 2011, 8:22 am
We recently hire a new waste hauler who uses scaled front loader trucks to collect our waste & recyclables. Our numbers are slowly creeping towards the 50%, but we want to include the... Last reply: Dan Ackerstein, Mar 14, 2011, 12:29 pm |
|
Building ReuseNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Brian Blodnikar on Mar 10, 2011, 5:09 pm
We are constructing a new building next to the existing building, the two buildings will not be attached. Essentialy the client is building a new building to expand out of the existing building... Last reply: Brian Blodnikar, Mar 14, 2011, 9:57 am |
|
question about set of fan power in simulation programNC-2009 EAp2: Minimum Energy Performanceposted by lin wang on Mar 13, 2011, 10:28 pm
The fan power calculated by the formula presented in APPENDIX G3.1.2.9 of ASHREA90.1-2007 is the sum of all the fan power including supply fan,returen fan,exaust/relief fan. However,in... Last reply: Marcus Sheffer, Mar 14, 2011, 9:04 am |
|
Free materialsCI-2009 MRc4: Recycled Contentposted by Martin O'Donnell on Mar 14, 2011, 5:06 am
Hi our company has moved to a new office and we are submitting for LEED gold. However some of our suppliers gave us material for free such as the mineral board ceiling (as we are a design... Last reply: Nadav Malin, Mar 14, 2011, 8:52 am |
|
Energy Star- Statement Energy PerformanceEBOM-2009 WEc1: Water Performance Measurementposted by Simon Sue on Mar 7, 2011, 5:48 am
Please help: Last reply: Simon Sue, Mar 12, 2011, 9:37 pm |
|
Weather dataNC-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Mar 10, 2011, 12:47 pm
I'm modeling a project oustide the US with Carrier HAP. This place is not in the weather data base of HAP, or DOE's web page, and even though it was, HAP does not allow IWEC files, so I'm kind... Last reply: javier bolanos zeledon, Mar 12, 2011, 6:09 pm |
|
Natural ventilation-energy modelingNC-2009 EAp2: Minimum Energy Performanceposted by Camilo Velez on Feb 8, 2011, 3:43 pm
It's the firts time that we work with LEED, and we are working in the desing of a office bulding, that will have natural ventilation system, instead of a standar HVAC system, (we already did... Last reply: Marcus Sheffer, Mar 12, 2011, 2:00 pm |
|
Moisture ProtectionNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Brad Buser on Mar 3, 2011, 7:01 pm
I need some help understanding the moisture projection requirements of this credit. Our... Last reply: Allison Beer McKenzie, Mar 12, 2011, 11:42 am |