Central Plant QuestionNC-2009 EAc4: Enhanced Refrigerant Managementposted by Lauren Sparandara on May 6, 2011, 2:49 pm
Scenario: Campus new construction projects which are connecting to an existing central plant for heating and cooling. The reference guide and... Last reply: Lauren Sparandara, May 11, 2011, 2:45 pm |
|
Is Sealing off 'unused' Door acceptable to meet Requirements?EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Lori Winneshiek on May 2, 2011, 10:29 am
We have a building that used to be muti-tenanted to a far greater extent than it is now and has many unused doors that once acted as dedicated entrances to a number of small suites but no longer... Last reply: Dan Ackerstein, May 11, 2011, 12:42 pm |
|
Post-review changes to the performance periodPerformance Periodposted by Melissa Young on Apr 25, 2011, 9:36 am
We submitted our preliminary application for LEED 2009... Last reply: Dan Ackerstein, May 11, 2011, 12:36 pm |
|
Increase in FTE during performance periodPerformance Periodposted by Matthew Perna on Apr 25, 2011, 2:50 pm
The top floor of our 4 story building was fit out and rented toward the end of our performance period (it was... Last reply: Dan Ackerstein, May 11, 2011, 12:33 pm |
|
Retaining rainwater for future usesCS-2009 SSc6.1: Stormwater design - quantity controlposted by Gabriela Hernández Castillo on Mar 23, 2011, 4:24 pm
Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but... Last reply: Gabriela Hernández Castillo, May 11, 2011, 12:30 pm |
|
62MZ Calculation for IEQ2- For VAV SystemsSchools-2009 IEQc2: Increased Ventilationposted by Laura Long on Nov 24, 2010, 4:19 pm
The LEED Reference Guide only addresses the increased ventilation calculation at the zone level, not the system level. I understand that the outdoor air supplied to each zone needs to be... Last reply: Julia Weatherby, May 11, 2011, 9:58 am |
|
specific mechanical drawings for PI4?General forumsposted by Erica Downs on Apr 4, 2011, 2:59 pm
Does anyone know specifically which "mechanical" drawings... Last reply: Kimberly Frith, May 11, 2011, 9:12 am |
|
Increase Ventilation- CorridorCI-2009 IEQc2: Increased Ventilationposted by Simon Sue on May 10, 2011, 2:32 am
Hi, Last reply: David Hubka, May 10, 2011, 2:48 pm |
|
Remnant Limestone- any LEED credit there?CS-2009 MRc3: Materials Reuseposted by Julie Hendricks on May 9, 2011, 4:37 pm
My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding. My instinct tells me these pieces won't count as either... Last reply: Julie Hendricks, May 10, 2011, 9:29 am |
|
Occupancy SensorCI-2009 EAp2: Minimum Energy Performanceposted by Simon Sue on May 9, 2011, 3:40 am
We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors). do we... Last reply: Kimberly Frith, May 10, 2011, 8:23 am |