Log in
Forum
Topic

Central Plant Question

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Lauren Sparandara on May 6, 2011, 2:49 pm

Scenario: Campus new construction projects which are connecting to an existing central plant for heating and cooling. The reference guide and...

Last reply: Lauren Sparandara, May 11, 2011, 2:45 pm

Is Sealing off 'unused' Door acceptable to meet Requirements?

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Lori Winneshiek on May 2, 2011, 10:29 am

We have a building that used to be muti-tenanted to a far greater extent than it is now and has many unused doors that once acted as dedicated entrances to a number of small suites but no longer...

Last reply: Dan Ackerstein, May 11, 2011, 12:42 pm

Post-review changes to the performance period

Performance Period
posted by Melissa Young on Apr 25, 2011, 9:36 am

We submitted our preliminary application for LEED 2009...

Last reply: Dan Ackerstein, May 11, 2011, 12:36 pm

Increase in FTE during performance period

Performance Period
posted by Matthew Perna on Apr 25, 2011, 2:50 pm

The top floor of our 4 story building was fit out and rented toward the end of our performance period (it was...

Last reply: Dan Ackerstein, May 11, 2011, 12:33 pm

Retaining rainwater for future uses

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Gabriela Hernández Castillo on Mar 23, 2011, 4:24 pm

Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but...

Last reply: Gabriela Hernández Castillo, May 11, 2011, 12:30 pm

62MZ Calculation for IEQ2- For VAV Systems

Schools-2009 IEQc2: Increased Ventilation
posted by Laura Long on Nov 24, 2010, 4:19 pm

The LEED Reference Guide only addresses the increased ventilation calculation at the zone level, not the system level. I understand that the outdoor air supplied to each zone needs to be...

Last reply: Julia Weatherby, May 11, 2011, 9:58 am

specific mechanical drawings for PI4?

General forums
posted by Erica Downs on Apr 4, 2011, 2:59 pm

Does anyone know specifically which "mechanical" drawings...

Last reply: Kimberly Frith, May 11, 2011, 9:12 am

Increase Ventilation- Corridor

CI-2009 IEQc2: Increased Ventilation
posted by Simon Sue on May 10, 2011, 2:32 am

Hi,
we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor. the corridor is a simple walkway for employees walk...

Last reply: David Hubka, May 10, 2011, 2:48 pm

Remnant Limestone- any LEED credit there?

CS-2009 MRc3: Materials Reuse
posted by Julie Hendricks on May 9, 2011, 4:37 pm

My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding. My instinct tells me these pieces won't count as either...

Last reply: Julie Hendricks, May 10, 2011, 9:29 am

Occupancy Sensor

CI-2009 EAp2: Minimum Energy Performance
posted by Simon Sue on May 9, 2011, 3:40 am

We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors). do we...

Last reply: Kimberly Frith, May 10, 2011, 8:23 am