M&V data reportingNC-2009 EAc5: Measurement and Verificationposted by Joseph Greene on Mar 18, 2011, 4:35 pm
Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Last reply: Marcus Sheffer, Mar 18, 2011, 5:40 pm |
|
Low Flow Kitchen SinkCI-2009 WEp1: Water Use Reductionposted by Jay Murray on Mar 16, 2011, 12:06 pm
We are renovating and entire floor (43,000 office space square feet). We are replacing the lavs to .09 gallons per cycle and possibly replacing the urinals to .5 gpf or waterless, not sure about... Last reply: Erik Ruoff, Mar 18, 2011, 1:38 pm |
|
registering after construction startsGeneral forumsposted by Tristan Roberts on Mar 18, 2011, 12:01 pm
Guillermo, this should not be a problem from what you have said so far. Fore more information I would check out this forum on... |
|
ASHRAE 62 vs. LEED OnlineEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Jim Newman on Nov 12, 2009, 5:55 pm
On LEED Online they suggest that you only need to identify critical spaces and enter that into the spreadsheet, whereas ASHRAE 62 wants you to list all zones, not just critical zones. If we do... Last reply: Julia Weatherby, Mar 18, 2011, 12:59 am |
|
Define "no new parking"- project site is a former parking lotNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Jill Ziegler on Mar 17, 2011, 12:04 pm
My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only. When all is said and done, and when... Last reply: David Posada, Mar 17, 2011, 5:05 pm |
|
Electric RatesSchools-2009 EAc1: Optimize Energy Performanceposted by Laura Long on Mar 17, 2011, 3:11 pm
The electric company for our school project offers a rate... Last reply: Marcus Sheffer, Mar 17, 2011, 4:47 pm |
|
Project boundary within an existing buildingCI-2009 SSc2: Development Density and Community Connectivityposted by R Jones on Mar 16, 2011, 10:38 am
Hi - when doing the calculations for option 1 - should i include the sf of the project (ie tenant space) or the whole building - then divide it by the area. The project uses 10 floors of a 30... Last reply: R Jones, Mar 17, 2011, 2:04 pm |
|
Water Use ReductionNC-2009 WEc3: Water Use Reductionposted by Rick Blackshere on Oct 15, 2010, 11:15 am
I am currently working on a project where we are returning an... Last reply: Nick _, Mar 16, 2011, 5:01 pm |
|
Food Service Hand Wash SinksNC-2009 WEp1: Water Use Reductionposted by Erica Downs on Sep 30, 2010, 9:57 am
Does anyone know how many times per day food service workers (i.e., in a university dining hall) wash -- or are supposed to wash -- their hands? I have no idea, but I'm guessing it should be in... Last reply: Erica Downs, Mar 16, 2011, 3:35 pm |
|
Wood as thermal barrierNC-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Mar 15, 2011, 8:39 am
Is it valid to use 1"... Last reply: Marcus Sheffer, Mar 16, 2011, 3:24 pm |