LEED CI v3 in a central London building 3 out of 40 floorsCI-2009 EAp2: Minimum Energy Performanceposted by R Jones on Sep 6, 2010, 10:53 am
I am trying to undertake the assessment of EAp2 and EA1 energy credits for a building in central London. Its about 40 floors but the project scope is to renovate only 3 floors. None of the... Last reply: Eszter Gulacsy, May 10, 2011, 7:51 am |
|
EAPr2- Lighting Control (shut-off control and space control)CI-2009 EAp2: Minimum Energy Performanceposted by Ramesh Narayanan on Feb 25, 2011, 1:55 am
Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory... Last reply: Simon Sue, May 10, 2011, 3:12 am |
|
Five year shade calculation.NC-2009 SSc7.1: Heat island effect - nonroofposted by sara frye on Apr 27, 2011, 4:34 pm
Apologies in advance as I know I have read the answer to my question somewhere. I just can't find it. WHEN should the five year shade calculation be performed? i.e time of day, time of year?... Last reply: Jacob Arlein, May 9, 2011, 8:16 pm |
|
Prescriptive Method: skylight zones?NC-2009 IEQc8.1: Daylight and views - daylightposted by Kash Boodjeh on May 9, 2011, 4:56 pm
Hello, We are pursuing the Prescriptive Method for this credit, using both skylights and windows. I am entering in the data for the skylights and am not sure how to answer the first two... |
|
Existing lighting in project boundarySchools-2009 SSc8: Light Pollution Reductionposted by Lisa Logan on May 9, 2011, 1:12 pm
My project boundary includes a baseball playing field which will be new - but the lighting around it is existing. Our reviewer wants info on that lighting but to find IES photometric files for... |
|
alt. process water treatment (similar to dolphin system)NC-2009 IDc1: Innovation in Designposted by Lisa Marshall on Apr 21, 2010, 1:52 pm
We have been turned down by... Last reply: Barbara McCrary, May 6, 2011, 2:10 pm |
|
Interpretation table 5.5-4 ASHRAE 2007 mandatory provisionsNC-2009 EAp2: Minimum Energy Performanceposted by Vindio Corro on Apr 22, 2011, 6:20 am
We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. Last reply: Marcus Sheffer, May 6, 2011, 9:35 am |
|
Combined Sewer AreasPilot-Credits WEpc10: Sustainable wastewater managementposted by Scott Durbin on May 4, 2011, 5:29 pm
In areas with combined sewers, could option 1 be achieved by reducing runoff volume to the sewer? Last reply: Karen Poff, May 5, 2011, 6:14 pm |
|
LZ3 commentNC-2009 SSc8: Light Pollution Reductionposted by James Weingarten on May 5, 2011, 4:52 pm
This may stretch a bit outside the LEEDuser realm, but...... I received a comment on a past project, where the reviewer wanted verification that the project was actually a LZ3 as defined... |
|
LEED CS & LEED CI- PV arrayCS-2009 EAc1: Optimize Energy Performanceposted by S. Sachs on May 5, 2011, 2:43 pm
Hi, I am working on a LEED CS project, at the same time the tenant is pursuing LEED CI (separate submission) and planning to install a PV array to achieve the 2.5% of building electricty... Last reply: Christopher Schaffner, May 5, 2011, 4:27 pm |