Log in
Forum
Topic

What about SIPs?

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Nelina Loiselle on Nov 8, 2011, 1:59 pm

Would structural insulated panels made from PS foam cores sandwiched between...

Last reply: David Posada, Nov 8, 2011, 8:24 pm

What about for an initial interior fit-out?

Pilot-Credits PC20: Recycled Content
posted by Habitech Distretto Tecnologico Trentino on Apr 14, 2011, 11:06 am

Hello all.
I am working on a LEED-CI project.
The situation is an initial interior fit-out (build-out of areas where there are no existing interior walls, finishes, etc.) and the...

Last reply: Juan Ramos, Nov 8, 2011, 7:13 pm

IEQ Credit 1- ASHRAE 62.1-2007 Calculator

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Nathan Romblad on May 26, 2010, 1:54 pm

I’m working on the documentation for IEQ, Credit 1 – Outdoor Air Delivery Monitoring and have a question on the New Construction, Version 3 Template for the credit. The template asks for the...

Last reply: Emily Catacchio, Nov 8, 2011, 5:59 pm

MERV 13 Filters on both Return and Outside Air (Re-Amended?)

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by EunChung Kim on Nov 8, 2011, 4:43 am

So it seems that as of July 2010,...

Last reply: Dylan Connelly, Nov 8, 2011, 3:56 pm

Sharing Waste Bins

CS-2009 MRc2: Construction Waste Management
posted by Elizabeth Durney on Jul 13, 2011, 6:50 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up November 8, 2011- 3:55 pm Elizabeth-- Michelle asked me to share this link to a comment on the NC 2009 forum about a project where she split this out successfully. Log in or register to post comments ...

Last reply: Tristan Roberts, Nov 8, 2011, 3:55 pm

Bentonite mud/sludge

CS-2009 MRc2: Construction Waste Management
posted by Paola Figueiredo on Oct 26, 2011, 2:24 pm

Hi,

Bentonite mud used for filling in the foundation phase is normally sent to special landfills as hazardous waste, thus being excluded from MR2 calculations.

However, there is a...

Last reply: RETIRED, Nov 8, 2011, 3:37 pm

Insulation requirements

CS-2009 EAp2: Minimum Energy Performance
posted by Gabriela Hernández Castillo on Nov 1, 2011, 6:34 pm

Our LEED building consits on an 39 stories speculative office building that is on top of a 3 stories retail building. The retail will not apply for LEED certification.

The retail's roof...

Last reply: Gabriela Hernández Castillo, Nov 8, 2011, 3:37 pm

Undeveloped land- definition

Schools-2009 SSc1: Site Selection
posted by Gendel Metlitsky on Jul 12, 2011, 11:00 am

The 3.5 acre project site is wooded with mature trees. It was developed years ago, but all structures were demolished 40-50 years ago.

Should this site to be considered developed or...

Last reply: Tristan Roberts, Nov 8, 2011, 3:34 pm

Demolition debris / Land-clearing debris

CS-2009 MRc2: Construction Waste Management
posted by Petra Hajná on Jun 30, 2011, 4:45 am

What is the difference between these two categories? Demolition debris counts towards waste management and land-clearing doesn't. But how do these two differ from each other?
For example a...

Last reply: RETIRED, Nov 8, 2011, 3:07 pm

hardfill

Schools-2009 MRc2: Construction Waste Management
posted by Eri Spaulding on Sep 15, 2011, 2:49 pm

In one of our projects, most of the construction waste (especifically concrete and masonry) has been used as hardfill in land outside this project, in a location where other construction will...

Last reply: Tristan Roberts, Nov 8, 2011, 2:50 pm