Topic | Recent |
---|---|
Has anybody tried this with PEFC certified woodNC-2009 MRc7: Certified Woodposted by Jean Marais on Aug 12, 2010, 2:13 amLast reply: Doug Pierce, AIA, Jan 23, 2012, 2:43 pm |
|
Exemplary PerformanceNC-2009 MRc7: Certified Woodposted by J Morrison on Jan 20, 2012, 10:21 am
Have been having difficulty uploading documents for this credit. I called the 800 number and they said that they were having technical difficulties and to try again later. I then tried to set... Last reply: Doug Pierce, AIA, Jan 23, 2012, 2:36 pm |
|
Having Trouble Getting Compliance for EAp2NC-2009 EAp2: Minimum Energy Performanceposted by Brian ORourke on Jan 23, 2012, 1:55 pm
I am working on a LEED project and we hired an engineer to run an energy model on EQuest. He then submitted all the required forms and entered all of the information onto the associated form,... Last reply: Marcus Sheffer, Jan 23, 2012, 2:11 pm |
|
Energy Star EquipmentCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Ramesh Narayanan on Feb 24, 2011, 4:26 amRamesh, I would recommend reading about this question in the information above under "Bird's Eye View" and below in other forum discussions. Log in or register to post comments Ron Frank... Last reply: Shevaun Barrie, Jan 23, 2012, 1:20 pm |
|
recycling versus incinerationNC-2009 MRc2: Construction Waste Managementposted by Jeff Jones on Jul 21, 2011, 10:36 am
I am receiving conflicting information regarding landfill diversion documentation and the ability to count materials that are used as a "fuel product" (paid for by... Last reply: Kathy Trejo, Jan 23, 2012, 1:03 pm |
|
Alternative Transportation Survey Results Calculator- ErrorEBOM-2009 SSc4: Alternative Commuting Transportationposted by Tyler Farmer on Jan 11, 2012, 2:41 pmI tried the other settings (Auto Except for Data Tables and Manual) and they did not resolve the error message either. I will look at some excel forums to see if I can find a solution. Thanks. Log... Last reply: Klaus Zednik, Jan 23, 2012, 10:23 am |
|
Light trespass from pedestrian access routesCS-2009 SSc8: Light Pollution Reductionposted by Magnus Stagnäs on Jan 23, 2012, 9:39 am
In our project (LZ3) we have a separate pedestrian route accessing the site. The local government requires the route to be sufficiently illuminated, which means that the... |
|
geothermal systemNC-2009 MRc4: Recycled Contentposted by Emmanuel Pauwels on Jan 15, 2012, 1:01 am
Our project includes a geothermal system. When calculating the total material cost I wonder in which division of the CSI masterformat should the cost of this system be accounted for. The... Last reply: Tim Crowley, Jan 21, 2012, 10:58 am |
|
incorporating materials from Divisions outside 2-10, 31 & 32NC-2009 MRc4: Recycled Contentposted by Christopher Sawyer on Apr 16, 2010, 12:03 pm
Although the Credits state that MEP and other products should be excluded, may they be included in the calculations if desired? I have the opportunity to get... Last reply: Tim Crowley, Jan 21, 2012, 10:56 am |
|
Cost info on LEED EBOMGeneral forumsposted by James Doyle on Jan 20, 2012, 3:15 pm
For LEED EBOM cost... |