Topic | Recent |
---|---|
[Pilot] Enhanced Acoustical Performance- Exterior Noise ControlCI-v4 INc1: Innovationposted by Cecilia Esparza on May 23, 2023, 11:14 am
For residential projects, the Pilot credit for Exterior Noise Control requires a "maximum interior noise level (Lmax) or 45... |
|
Glare control: UGRSchools-NC-v4.1 EQc6: Interior lightingposted by Alicia Davila on May 23, 2023, 7:32 am
For glare control one of the options, to obtain the credit, is having a value of <19 UGR, but is this value an average of the full calculation or it is the maximum value? As an example... |
|
Inconsistent ITE Referenced Documentation, Which to use??NC-v4 LTc7: Reduced parking footprintposted by Brian Salazar on May 9, 2023, 10:25 am
Hello! The LEED Credit web site lists the hardly legible ITE parking ratios table 3rd Edition as a resource for determining baseline ratios. This site lists a different table , 5th Edition, with... Last reply: Edgar Arevalo, May 22, 2023, 2:47 pm |
|
IP Worksheet- Very confusing languageNC-v4 IPc1: Integrative processposted by Maria Grimm on Jan 23, 2019, 2:55 pm
I'm working on a project where we completed a very thorough IP analysis during concept design. I am finding now, however, that filling out the IP worksheet is extremely painful due to very... Last reply: Nadia Azzam, May 22, 2023, 2:20 pm |
|
Using ARC transportation survey results for LEED v4?EBOM-v4 LTc1: Alternative Transportationposted by Green Building Team on May 22, 2023, 9:26 am
Hi All, as in the topic, do you Guys think we can use the Arc tool and the survey link it generates, to verify how people commute to/from the building? I know the scope form the v4 and v4.1... |
|
Ablution UnitNC-v4 WEp2: Indoor water use reductionposted by Osman Faroq on May 22, 2023, 1:10 am
Hi LEED Users, In our project we have an ablution unit (used for Muslim prayers to wash hands and feet). How these fixtures are included in the water usage calculation. Regards, ... Last reply: Osman Faroq, May 22, 2023, 8:53 am |
|
Open space- overhead vegetable canopyNC-v4 SSc3: Open spaceposted by Agnieszka Świetlik on May 19, 2023, 4:24 am
Hi, Could you please help me to understand what "overhead vegetable canopy" means? Is it the area under the green tunel with ivy or simillar plants? Or maybe a pavement under... Last reply: Afogreen Build, May 21, 2023, 8:53 pm |
|
Does a product containing 0 g/L VOC still need emissions testing?NC-v4 EQc2: Low-emitting materialsposted by Gretchen Krumm on May 16, 2023, 9:36 am
Does a product containing 0 g/L... Last reply: Afogreen Build, May 21, 2023, 8:51 pm |
|
Pilot Credit: Procurement of Low Carbon Construction Materials (Cemco Sure-Board)NC-v4 INc1: Innovationposted by Dejana Harris on Apr 24, 2023, 6:53 pm
A project pursuing MRpc123 Procurement of Low Carbon Construction Materials is using Cemco Sure-Board, which is a prefabricated fiber cement panel and steel... Last reply: Afogreen Build, May 21, 2023, 8:48 pm |
|
Documentation for multiple projectsPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by swapnil patil on Feb 15, 2022, 10:12 pmJoseph Andracchio Steven Winter Associates LEEDuser Basic Member May 19, 2023- 4:20 pm I typically provide different or updated feedback for each project that utilizes this pilot credit. I note any updated experience, and check the forum to answer any questions. The intent is to provide usable feedback, so the same post every time wouldn't be considered helpful, though if you have the same process and experience, I assume posts would look similar. Log in or register to post comments ... Last reply: Joseph Andracchio, May 19, 2023, 4:20 pm |