Topic | Recent |
---|---|
Off site water storageEBOM-2009 SSc6: Stormwater Quantity Controlposted by Prudence Ferreira on Feb 3, 2011, 6:56 pm
Our project site is a winery that directs stormwater to ponds which are later used for irrigation. The only thing is that the ponds are sometimes considerably distant from the LEED building.... Last reply: Tristan Roberts, Feb 7, 2011, 11:58 pm |
|
WEp1- Annual Days of OperationEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on Feb 3, 2011, 5:41 pm
Hi, Appreciate any assistance. Thanks, Last reply: Tristan Roberts, Feb 7, 2011, 11:43 pm |
|
Option 1. Project in a LEED C&S precertified buildingCI-2009 SSc1: Site Selectionposted by Daniela Castro Salgado on Jan 24, 2011, 4:44 pm
We are trying to certify the interior of our office which is within a LEED precertified project. We will only get certification by the beginning of next year since the entire project is no yet... Last reply: Tristan Roberts, Feb 7, 2011, 10:50 pm |
|
2 things mat and chemical mixing areaCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Sue Barnett on Feb 7, 2011, 4:23 pm
I have a major building entrance in my LEED boundary as well as some exterior entrances to a courtyard- do I need the mats to the courtyard area too? Last reply: Tristan Roberts, Feb 7, 2011, 10:46 pm |
|
Grade 2-5 Elementary SchoolSchools-2009 IEQc7.2: Thermal comfort - verificationposted by Kimberly Cullinane on Jan 29, 2011, 9:42 pm
Just confirming that we are still eligible for this credit even if our project is a grade 2-5 elementary school. In our case, we would just need to survey all teachers and staff? Last reply: Tristan Roberts, Feb 7, 2011, 10:07 pm |
|
Sample CalculationsNC-2009 WEc2: Innovative Wastewater Technologiesposted by Craig Phillips on Feb 3, 2011, 5:33 pm
I am finding it hard to locate a 1.0 or a dual flush 1.6/.8 toilet and flushometer. Where did the data come from in the sample calculations? Lyn Last reply: Tristan Roberts, Feb 7, 2011, 10:05 pm |
|
Definition of "residential area or neighborhood and moreSchools-2009 SSc2: Development Density and Community Connectivityposted by Kimberly Cullinane on Jan 29, 2011, 11:53 am
Our school project is located to plenty of basic services in the "downtown" area of a rural community. But, I'm wondering if there is any specific definition of "residential area or neighborhood... Last reply: Tristan Roberts, Feb 7, 2011, 9:59 pm |
|
Areas between PV panels and mech equipmentNC-2009 SSc7.2: Heat island effect - roofposted by R Jones on Feb 4, 2011, 12:03 pm
I see that there are rulings about not including... Last reply: Tristan Roberts, Feb 7, 2011, 9:39 pm |
|
Documentation Tootkit available?NC-2009 IEQc8.2: Daylight and views - viewsposted by Lee Dingemans on Aug 19, 2010, 2:02 pm
There is no documentation toolkit for this credit? I was looking more specifically for how to draw lines of sight on floor plans and sections? What is acceptable or not? If anybody has any they... Last reply: Tristan Roberts, Feb 7, 2011, 9:23 pm |
|
small green field in the midst of developed area?NC-2009 SSc5.1: Site development - protect or restore habitatposted by Eric JS on Feb 7, 2011, 8:07 pm
Dear all, Our site is a small narrow flat field full of grass with no previous human activity on it. However it is located in a developed industrial environment. It is located between two... Last reply: Tristan Roberts, Feb 7, 2011, 8:43 pm |