Topic | Recent |
---|---|
DES CommissioningNC-2009 EAc3: Enhanced Commissioningposted by Margaret Montgomery on Mar 24, 2011, 4:03 pm
We're looking at a project where we do meet all the conditions for enhanced... Last reply: Chris Ladner, Apr 26, 2011, 8:37 am |
|
All parking underground but one..CS-2009 SSc7.1: Heat island effect - nonroofposted by Mathilda Jonsson on Mar 17, 2011, 12:09 pm
Hi! Last reply: Mathilda Jonsson, Apr 26, 2011, 1:57 am |
|
LEED-CS v2.0 Title-24 2005 equivalent to ASHRAE 90.1-2004?CS-2009 EAc1: Optimize Energy Performanceposted by Lauren Sparandara on Apr 25, 2011, 2:40 pm
For projects registered under LEED-CS v2.0, is Title-24 2005 deemed equivalent to ASHRAE Standard 90.1-2004 for showing compliance with the EAc1 requirements? Last reply: Marcus Sheffer, Apr 25, 2011, 9:27 pm |
|
So far, not a problemGeneral forumsposted by Ricardo Sobral on Apr 13, 2011, 2:54 pm
I have not experienced difficulties about this. At first, owners are a little bit baffled, but then turn to be quite enthusiastic about the idea. I believe is a good way to get them involved.... Last reply: Karen Joslin, Apr 25, 2011, 8:42 pm |
|
Ev (System Efficiency) for Constant Volume 100% Outdoor Air SystNC-2009 IEQp1: Minimum indoor air quality performanceposted by Omer Moltay on Mar 30, 2010, 5:49 pm
Dear All, Looking at the LEED submittal form for this credit I am really confused. Having assumed that this will be very easy with a constant volume system that works only with 100%... Last reply: Roger Chang, Apr 25, 2011, 4:49 pm |
|
LEED EBOM for warehouses?LEED Rating System Selectionposted by Diego Prada on Apr 7, 2011, 12:08 pm
Hi everyone I would like to know if a mix-use office/retail/ warehouse complex can apply for... Last reply: Diego Prada, Apr 25, 2011, 1:36 pm |
|
Phased Project Rating System Selection- NC or CI/ CSGeneral forumsposted by Aaron Desatnik on Apr 1, 2011, 1:26 pm
I need to determine which rating system to use for a project where the client owns the whole building and is planning to renovate different floors in separate phases over four years. I've... Last reply: David Posada, Apr 25, 2011, 12:56 pm |
|
HIGHER EDU. PROJECTEBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Benoit Gosselin on Mar 30, 2011, 2:09 pmDavid Posada Integrated Design & LEED Specialist SERA Architects LEEDuser Expert 1980 thumbs up April 25, 2011- 12:26 pm You'll need to consider all workstations, not just the typical office ones. You can see a related discussion over at the NC 2009 EQc6.1 forum topic- there is a comment I posted on March 29, 2011 that describes an approach that would probably apply to your situation. Log in or register to post comments ... Last reply: David Posada, Apr 25, 2011, 12:26 pm |
|
"90% Minimum of building occupants"NC-2009 IEQc6.1: Controllability of systems - lightingposted by Sandra Heiser on Apr 25, 2011, 10:56 am
The requirement reads " Provide individual lighting controls for 90% (minimum) of the building occupants..." Is this based on the... Last reply: Sandra Heiser, Apr 25, 2011, 11:40 am |
|
WE Prerequisite qualification for a minimal CS projectCS-2009 WEp1: Water Use Reductionposted by Tak Louie on Mar 14, 2011, 6:48 pm
Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby.... Last reply: Susann Geithner, Apr 25, 2011, 9:30 am |