Lighting Fixture of equipment rooms in Data CentreCI-2009 EAp2: Minimum Energy Performanceposted by Natalie Wong on Jan 20, 2012, 2:49 am
We are now working on the lighting fixtures in a data centre. Last reply: Marcus Sheffer, Feb 2, 2012, 10:56 am |
|
EPP certification for proof of recycled content?NC-2009 MRc4: Recycled Contentposted by Renee Shirey on Jan 19, 2012, 5:15 pm
Has anybody ever had an issue with using an... Last reply: Steve Loppnow, Feb 1, 2012, 7:16 pm |
|
Epoxy Flooring AgainNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Mary Kay on Dec 7, 2011, 3:11 pm
I have a product by Sherwin-Williams "Tile-Clad High Solids" w/ a... Last reply: Steve Loppnow, Feb 1, 2012, 7:11 pm |
|
paints for steel doorNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Adi Negara, LEED AP BD+C on Jan 19, 2012, 3:15 am
where do these kind of paints fall under the Product Type of Table 1. IEQc4.2 Applicable... Last reply: Steve Loppnow, Feb 1, 2012, 7:03 pm |
|
Space types included in IEQ 4 credits?NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Timo Rintala on Jan 31, 2012, 6:44 am
Hi My questions conserns calculation of... Last reply: Steve Loppnow, Feb 1, 2012, 6:59 pm |
|
MERV 13 in residencesNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Iris Amdur on Dec 21, 2011, 5:20 pm
Has anyone submitted a residential project that has pursued the intent of the... Last reply: Dylan Connelly, Feb 1, 2012, 6:40 pm |
|
Mixed Use- Office/ ResidentialEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Lauren Wallace on Feb 1, 2012, 2:50 pm
My project contains 12 floors of commercial office space (95% occupied), a ground floor retail (100% occupied), and 30 stories of residential (30% occupied). As I understand it, we could easily... Last reply: Barry Giles, Feb 1, 2012, 3:32 pm |
|
GroutsNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Bruce Maine on Feb 1, 2012, 2:00 pm
Can someone tell me where 1168 or 1113 references "grout" for... Last reply: Bruce Maine, Feb 1, 2012, 2:48 pm |
|
Master Site Rating SystemLEED Guidance for Campuses and Multiple Buildingsposted by Omer Moltay on Dec 13, 2011, 10:24 am
How does one define under which rating system the master site should be registered? We have a 220.000 m2 built area Master Site. At this moment, two office buildings in the site will be... Last reply: Elizabeth Thompson, Feb 1, 2012, 1:09 pm |
|
Vacant Space FTE User GroupEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Kelly Witosky on Apr 21, 2011, 12:38 pm
We are working on a project that has completed the Preliminary Review Phase of Certification, this is a high-rise office building located in an urban area, with occupancy that fluctuated over the... Last reply: Dan Ackerstein, Feb 1, 2012, 12:18 pm |