Topic

no manufacturer or model #s- testing flush rates?

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Alice Cook on Jun 27, 2010, 7:59 pm

Our building is historic, and in Canada. Flush fixtures (toilets and urinals) do not have any indication as to manufacturer, model, OR flush rate. For the purposes of our calculation we've...

Last reply: Jason Franken, Jul 1, 2010, 9:56 am

Dual flush WC

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Yong Lee Low on Jun 25, 2010, 1:52 am

Hi, I am confused about the value to be input in case its a dual flush system with 3/6 l per flush.Which would be the appropriate value to be added to the WE calculator.Please help.

Last reply: Jason Franken, Jul 1, 2010, 9:51 am

FTE definition for other occupants

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Pablo Fortunato Suarez on Jun 21, 2010, 11:37 pm

This is more about...

Last reply: Jason Franken, Jul 1, 2010, 9:48 am

Check MPRs

General forums
posted by Tristan Roberts on Jun 30, 2010, 10:28 pm

Summer, if you haven't already, I recommend reviewing LEED's Minimum Program Requirements for background on some rules...

LEED rating system selection policy- schools

General forums
posted by Tristan Roberts on Jun 30, 2010, 10:22 pm

Denise, that depends on the specifics of the schools project—what grade level and how much of it is learning space. Check out the LEED...

Interior Light Fixture exemption- no direct line of site

EBOM-2009 SSc8: Light Pollution Reduction
posted by John Ida on Jun 30, 2010, 9:25 pm

Our building is a warehouse with only a single string of clerestory windows at the peak of a gabled roof. All interior light fixtures are ceiling hung T-8s that are 10-12 feet below the bottom...

EAp2 LEED Online form

CS-2009 EAp2: Minimum Energy Performance
posted by Richard Fost on May 4, 2010, 4:42 pm

For a core & shell project in which the developer does not have control over interior (tenant) build-out, why does the LEED Online form require (or is automatically populated with) EPA Target...

Last reply: Christopher Schaffner, Jun 30, 2010, 7:01 pm

Alternative Compliance Approach

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Richard Navarro on Jun 30, 2010, 12:51 pm

Hi I was wondering if it was possible to document the solid waste management for both ongoing and durable goods in an alternative way. The problem we are encountering is that we are trying to...

Last reply: Dan Ackerstein, Jun 30, 2010, 1:21 pm

Automatic Light Shut-off for the Whole Building

CI-2009 EAp2: Minimum Energy Performance
posted by Dee Spiro on Jun 30, 2010, 10:29 am

In Section 9. Lighting Requirements (ASRAE 90.1-2007) on page 141 of the reference guide, in the third paragraph it states that Section 9.4 describes the mandatory provisions for controls,...

Last reply: Paul Conrad, Jun 30, 2010, 10:39 am

Asbestos abatement for existing buildings prior to demolition

CS-2009 SSc3: Brownfield Redevelopment
posted by Kelly Pimmel on Jun 25, 2010, 6:14 pm

I'm working on two projects (LEED - CS v2 and LEED 2009 - NC) that both require the demolition of existing buildings on the project sites. The existing buildings have asbestos and other...

Last reply: David Posada, Jun 28, 2010, 5:48 pm