Log in
Forum
Topic

Re: Recycling System

General forums
posted by David Posada on Aug 19, 2010, 7:03 pm

I don't think this method has a good chance of being accepted. I'm guessing the reviewers would say it relies too much on the users to correctly bag and label the different items, and is too...

Last reply: David Posada, Aug 23, 2010, 11:56 am

Supporting documentation for IEQ P1

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Bob Richardson on Aug 12, 2010, 8:03 am

I'm working on a system with heat pumps and...

Last reply: Roger Chang, Aug 23, 2010, 9:20 am

Lighting requirements of Ashrae 90.1-2007

CI-2009 EAp2: Minimum Energy Performance
posted by Gahl Sorkin Spanier on Aug 20, 2010, 12:22 pm

Achieving the minimum Ashrea 90.1-2007 requirement for lighting power...

Last reply: John Bauer, Aug 22, 2010, 12:15 am

Underground Parking

EBOM-2009 SSc7.1: Heat island effect - nonroof
posted by Drew Wenzel on Aug 2, 2010, 4:50 pm

I'm working on a project where about 75% of our parking is located under the building itself. The LEED manual says there is "no...

Last reply: Jacob Arlein, Aug 20, 2010, 5:57 pm

Re-calibration & corrective action

NC-2009 EAc5: Measurement and Verification
posted by Jenny Stadelmann on Aug 20, 2010, 2:27 pm

Does the re-calibration of the as-built design energy model and the baseline model need to be done monthly during the 12 mos. M&V period, and then corrective action taken monthly based on how...

Last reply: Marcus Sheffer, Aug 20, 2010, 3:15 pm

restaurant equipment

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:14 pm

Should future restaurant equipment be enluded in the calcs?

Last reply: Marcus Sheffer, Aug 20, 2010, 3:08 pm

open space requirement

NC-2009 SSc5.2: Site development - maximize open space
posted by Matthew VanSweden on Aug 19, 2010, 11:50 am

in a...

Last reply: David Posada, Aug 20, 2010, 2:25 pm

Lighting and Equipment controlled by BMS

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:19 pm

What is the corret way of calculating lighting and equipment controlled by Building Management System?

Last reply: Marcus Sheffer, Aug 20, 2010, 2:20 pm

Roof space under the perforated panel

CS-2009 SSc7.2: Heat island effect - roof
posted by Grace Ming on Aug 17, 2010, 11:43 pm

Hello all,

Above the concrete roof of the project, there are the steel...

Last reply: Mara Baum, Aug 20, 2010, 1:53 pm

Bank Entrance Separate from Building Entrance

EBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source control
posted by Chris Munn on Jul 1, 2010, 1:01 pm

I am working with a builidng that has a main entrance into the building with 10 feet of matting, however they have a first floor tenant that is a bank with its own independent entryway from the...

Last reply: John Beeson, Aug 20, 2010, 1:01 pm