Re-calibration & corrective action

NC-2009 EAc5: Measurement and Verification
posted by Jenny Stadelmann on Aug 20, 2010, 2:27 pm

Does the re-calibration of the as-built design energy model and the baseline model need to be done monthly during the 12 mos. M&V period, and then corrective action taken monthly based on how...

Last reply: Marcus Sheffer, Aug 20, 2010, 3:15 pm

restaurant equipment

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:14 pm

Should future restaurant equipment be enluded in the calcs?

Last reply: Marcus Sheffer, Aug 20, 2010, 3:08 pm

open space requirement

NC-2009 SSc5.2: Site development - maximize open space
posted by Matthew VanSweden on Aug 19, 2010, 11:50 am

in a...

Last reply: David Posada, Aug 20, 2010, 2:25 pm

Lighting and Equipment controlled by BMS

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:19 pm

What is the corret way of calculating lighting and equipment controlled by Building Management System?

Last reply: Marcus Sheffer, Aug 20, 2010, 2:20 pm

Roof space under the perforated panel

CS-2009 SSc7.2: Heat island effect - roof
posted by Grace Ming on Aug 17, 2010, 11:43 pm

Hello all,

Above the concrete roof of the project, there are the steel...

Last reply: Mara Baum, Aug 20, 2010, 1:53 pm

Bank Entrance Separate from Building Entrance

EBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source control
posted by Chris Munn on Jul 1, 2010, 1:01 pm

I am working with a builidng that has a main entrance into the building with 10 feet of matting, however they have a first floor tenant that is a bank with its own independent entryway from the...

Last reply: John Beeson, Aug 20, 2010, 1:01 pm

I-BEAM

EBOM-2009 IEQc1.1: Indoor air quality best management practices - indoor air quality management program
posted by Michael Chermak on Jul 20, 2010, 5:48 pm

This is an interesting credit point with little information besides a reference to the EPA I-BEAM. There seems to be a wide range of responses to the challenges set forth in obtaining this credit...

Last reply: John Beeson, Aug 20, 2010, 12:35 pm

62.1 app for iPhone/iPad users

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Shillpa Singh on Aug 20, 2010, 11:00 am

ASHRAE released an app for iPhone, iPod touch, and iPad that allows you to perform comprehensive minimum ventilation calculations for a wide variety of commercial buildings based upon Standard 62...

LEED 2009 vs. 2.2

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Anne Marie Kuban on Mar 19, 2010, 8:13 pm

So I have a room of 300SF with a window area (above the 30"zone) of
56 SF and a...

Last reply: Jill Perry, PE, Aug 20, 2010, 10:54 am

pilot credits- we need your help!

Pilot-Credits PC6: Integrative Project Planning & Design
posted by brendan owens on Aug 20, 2010, 10:47 am

Hi LEEDusers -

The idea behind pilot credits is to get feedback from project team members on the concepts we're testing so that USGBC can learn from your experience and make these credits...