Topic | Recent |
---|---|
Using Option 4NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Deborah Lucking on Dec 1, 2010, 8:05 pm
Requesting some guidance in submitting for this credit using Option 4... Last reply: David Posada, Dec 2, 2010, 7:10 pm |
|
Fenestration and doors leakageCS-2009 EAp2: Minimum Energy Performanceposted by javier bolanos zeledon on Dec 1, 2010, 3:10 pm
According to Ashrae 90.1 5.4.3.2 air leakage for fenestration and doors shall be determined in accordance with... Last reply: javier bolanos zeledon, Dec 2, 2010, 12:04 pm |
|
Option 2 prescriptiveCS-2009 IEQc8.1: Daylight and views - daylightposted by Sofia Nordström on Nov 19, 2010, 4:17 am
Hi, I’m working with a CS project and we have chosen to go for Option 2, the prescriptive path. My issue is that the project consists of an 8 story square building with a large skylight and... Last reply: Eddy Santosa, Dec 1, 2010, 9:12 pm |
|
Location of hardscape areasNC-2009 SSc5.2: Site development - maximize open spaceposted by Laurie Hammack on Dec 1, 2010, 7:34 pm
In reading the wording for this credit under 2009 NC, it mentions for all cases that "projects in urban areas that earn SS Credit 2: Development Density and Community Connectivity, pedestrian-... Last reply: Devon Bertram, Dec 1, 2010, 7:55 pm |
|
Same here. Its been about 15General forumsposted by Patrick Jones on Dec 1, 2010, 2:02 pm
Same here. Its been about 15 minutes for me and don't see a confirmation email yet. Last reply: Batya Metalitz, Dec 1, 2010, 2:24 pm |
|
Pedestrian Access by Residential AreaCS-2009 SSc2: Development Density and Community Connectivityposted by Karla Fisk on Nov 19, 2010, 9:12 am
In using Option 2 - Community Connectivity, must the residential area have unimpeded pedestrian access to the project, as well as the project having unimpeded pedestrian access to the 10 basic... Last reply: Karla Fisk, Dec 1, 2010, 2:04 pm |
|
Intersection countingPilot-Credits PC9: Street Networkposted by Benoit Tesch on Oct 28, 2010, 11:52 am
I am not sure sure how to count the intersection. Our building is located in a high... Last reply: Batya Metalitz, Dec 1, 2010, 1:52 pm |
|
solar light tubes/daylight scoopsEBOM-2009 IEQc2.4: Daylight and Viewsposted by Pablo Fortunato Suarez on Nov 29, 2010, 12:42 pm
Will solar light tubes and daylight scoops be acceptable is they are able to bring in the minimum illumination level prescribed in Path 3 or is this credit solely for windows, clerestories and... Last reply: Pablo Fortunato Suarez, Dec 1, 2010, 1:46 pm |
|
Variable section windowsNC-2009 IEQc8.1: Daylight and views - daylightposted by Helena Berlanga on Nov 24, 2010, 11:31 am
Hello, Last reply: Eddy Santosa, Dec 1, 2010, 12:23 pm |
|
M&V for MURB/retirement homeNC-2009 EAc5: Measurement and Verificationposted by Brian Farrelly on Nov 30, 2010, 4:00 pm
I'm in the process of creating a M&V plan for a retirment building which is basically a MURB. Determining what to meter on the central plant is relative straight forward, however the problem... Last reply: Marcus Sheffer, Dec 1, 2010, 9:50 am |