Topic | Recent |
---|---|
Manufacturer claims of proprietary informationNC-2009 MRc5: Regional Materialsposted by Eric Shamp on Jun 1, 2011, 12:44 pm
We've run across a couple of products in which the manufacturer provides a letter attesting to full compliance with MRc5, but we know for sure it can't be true... take, for example, carpet or... |
|
CO2 sensor issueCS-2009 IEQc1: Outdoor Air Delivery Monitoringposted by G B on Mar 13, 2011, 6:49 pm
Hello all, Last reply: Jean Marais, Jun 1, 2011, 11:07 am |
|
wow! also heard ASHRAE isGeneral forumsposted by Jean Marais on Jun 1, 2011, 10:02 am
wow! also heard ASHRAE is translating standards into Spanish...are we slowly becoming global? |
|
Controllability of Systems- Lighting DocumentationCI-2009 IEQc6.1: Controllability of systems - lightingposted by Robert Longo, AIA, LEED AP on May 31, 2011, 1:42 pm
How do I go about providing documentation to meet this credit. I am working on a fit out project for a new office. There are roughly 900 cubes with task lighting at each cube, offices with... Last reply: Lauren Sparandara, May 31, 2011, 7:11 pm |
|
ETS Control- Hospitality ProjectEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Ashu Gupta on Nov 24, 2010, 10:39 am
As per ... Last reply: Jorge Torres-Coto, May 31, 2011, 4:30 pm |
|
EAp2 Section 1.4 tables.xlsCS-2009 EAp2: Minimum Energy Performanceposted by Yu Wang on May 23, 2011, 6:00 am
I am in need of help with EAp2 Section 1.4 tables.xls. This project is for new construction. Last reply: Marcus Sheffer, May 31, 2011, 12:56 pm |
|
Weighted average for new construction + major renovation?NC-2009 EAc1: Optimize Energy Performanceposted by Bethany Beers on May 25, 2011, 11:45 am
We are performing a review of an energy model for a project that is a major remodel of an existing space with addition of new square footage. The modeler is proposing a weighted average of the... Last reply: Marcus Sheffer, May 31, 2011, 10:05 am |
|
ASHRAE mandatory provisions for existing buildingNC-2009 EAp2: Minimum Energy Performanceposted by Wei Jiang on May 31, 2011, 9:43 am
Our project is a major renovation project. Do the ASHRAE mandatory provisions apply to existing systems/components that are not altered? From ASHRAE 90.1-2007, the scopes for several section (... Last reply: Marcus Sheffer, May 31, 2011, 10:00 am |
|
Mechanical Equipment- Alternative compliance pathSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Marcio Alberto Casado Pereira on May 9, 2011, 12:00 pm
We are currently working on a project wich the HVAC system selected was the split highwall, and there are 3 evaporation machines inside each classroom. The measurement taken inside the classroom... Last reply: Marcio Alberto Casado Pereira, May 30, 2011, 10:16 am |
|
Design Submittal- To do or not to do?General forumsposted by Shannon Deeb on Apr 30, 2011, 12:19 pmthat are found in the BD&C Reference Guide Appendix 1. For energy modeling of those spaces see Appendix 2, and also the NC and CS 2009 EAp2 forums- there are some related comments there. Log in or register... Last reply: Shannon Deeb, May 30, 2011, 10:02 am |