Topic | Recent |
---|---|
IEQp1 ASHRAE 62.1 CalculatorNC-2009 IEQp1: Minimum indoor air quality performanceposted by Shannon Allison on Nov 8, 2011, 1:48 pm
I read through previous posts and have not seen an answer to this question so forgive me if I missed it. The ASHRAE calculator does not seem to apply to 100% outdoor air systems. Is this true... Last reply: Dylan Connelly, Nov 8, 2011, 8:39 pm |
|
What about SIPs?NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Nelina Loiselle on Nov 8, 2011, 1:59 pm
Would structural insulated panels made from PS foam cores sandwiched between... Last reply: David Posada, Nov 8, 2011, 8:24 pm |
|
What about for an initial interior fit-out?Pilot-Credits PC20: Recycled Contentposted by Habitech Distretto Tecnologico Trentino on Apr 14, 2011, 11:06 am
Hello all. Last reply: Juan Ramos, Nov 8, 2011, 7:13 pm |
|
IEQ Credit 1- ASHRAE 62.1-2007 CalculatorNC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Nathan Romblad on May 26, 2010, 1:54 pm
I’m working on the documentation for IEQ, Credit 1 – Outdoor Air Delivery Monitoring and have a question on the New Construction, Version 3 Template for the credit. The template asks for the... Last reply: Emily Catacchio, Nov 8, 2011, 5:59 pm |
|
MERV 13 Filters on both Return and Outside Air (Re-Amended?)NC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by EunChung Kim on Nov 8, 2011, 4:43 am
So it seems that as of July 2010,... Last reply: Dylan Connelly, Nov 8, 2011, 3:56 pm |
|
Sharing Waste BinsCS-2009 MRc2: Construction Waste Managementposted by Elizabeth Durney on Jul 13, 2011, 6:50 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up November 8, 2011- 3:55 pm Elizabeth-- Michelle asked me to share this link to a comment on the NC 2009 forum about a project where she split this out successfully. Log in or register to post comments ... Last reply: Tristan Roberts, Nov 8, 2011, 3:55 pm |
|
Bentonite mud/sludgeCS-2009 MRc2: Construction Waste Managementposted by Paola Figueiredo on Oct 26, 2011, 2:24 pm
Hi, Bentonite mud used for filling in the foundation phase is normally sent to special landfills as hazardous waste, thus being excluded from MR2 calculations. However, there is a... Last reply: RETIRED, Nov 8, 2011, 3:37 pm |
|
Insulation requirementsCS-2009 EAp2: Minimum Energy Performanceposted by Gabriela Hernández Castillo on Nov 1, 2011, 6:34 pm
Our LEED building consits on an 39 stories speculative office building that is on top of a 3 stories retail building. The retail will not apply for LEED certification. The retail's roof... Last reply: Gabriela Hernández Castillo, Nov 8, 2011, 3:37 pm |
|
Undeveloped land- definitionSchools-2009 SSc1: Site Selectionposted by Gendel Metlitsky on Jul 12, 2011, 11:00 am
The 3.5 acre project site is wooded with mature trees. It was developed years ago, but all structures were demolished 40-50 years ago. Should this site to be considered developed or... Last reply: Tristan Roberts, Nov 8, 2011, 3:34 pm |
|
Demolition debris / Land-clearing debrisCS-2009 MRc2: Construction Waste Managementposted by Petra Hajná on Jun 30, 2011, 4:45 am
What is the difference between these two categories? Demolition debris counts towards waste management and land-clearing doesn't. But how do these two differ from each other? Last reply: RETIRED, Nov 8, 2011, 3:07 pm |