Topic | Recent |
---|---|
Main Entry facing a PlazaPilot-Credits PC14: Walkable Streetsposted by Roshini Das on Dec 6, 2011, 1:21 pm
Our project is a dormitory for 1-8 grade kids located in a campus. The main entry faces a plaza, second entry faces a parking cul-de-sac (entry faces the street with parking inside the cul-de-sac... |
|
Calculating 90% rainfall complianceNC-2009 SSc6.2: Stormwater design - quality controlposted by Simon Sue on Nov 29, 2011, 8:17 pm
We're currently working on a high-rise commercial building, and hope someone could shed some lights on the following questions: 1. Is it ok to calculate the % of rainfall captured and... Last reply: Amy Rider, Dec 6, 2011, 12:35 pm |
|
FTECS-2009 EAp2: Minimum Energy Performanceposted by Adam Targowski on Dec 6, 2011, 9:45 am
When can we use actual occupancy counts in energy modeling? Is it necessary to have a tenant lease to use the actual occupancy counts? Last reply: Marcus Sheffer, Dec 6, 2011, 10:00 am |
|
POLYETHYLENE TEREPHTHALATE (PET)Pilot-Credits PC11: Chemical Avoidance in Building Materialsposted by Julie Hendricks on Nov 14, 2011, 5:20 pm
I'm thinking of submitting for this pilot credit with one of my products being a type 6,6 Interface carpet tile (Tectonics). Pharos tells me that it contains PET- Polyethylene Terephthalate,... Last reply: Susan Walter, Dec 6, 2011, 8:18 am |
|
ExtensionGeneral forumsposted by Emily Catacchio on Nov 30, 2011, 9:16 am
Jason, Last reply: Susan Walter, Dec 6, 2011, 8:15 am |
|
Campus Boundary allowed?NC-2009 SSc8: Light Pollution Reductionposted by Jorng-ren Chern on Dec 6, 2011, 3:22 am
I have a project building located on a campus site, which consists 3 buildings from the same owner, but only one of the buildings is seeking for LEED certification. According to the statement... |
|
PC 9Pilot-Credits PC9: Street Networkposted by Nate Steeber on Dec 5, 2011, 5:35 pm
I really like this credit, and I think it shows a value to choosing a home locations that was otherwise unnoticed. I do, however, have some questions about intersections, and some options... Last reply: Michael Miller, Dec 5, 2011, 8:11 pm |
|
design phase denialLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Keelan Kaiser on Sep 27, 2011, 9:17 am
When submitting for a split review what are the options when a credit has been tagged as denied? Can the credit be re-reviewed during construction phase? Or is the only option appealing the... Last reply: Manny Iglesia, Dec 5, 2011, 5:40 pm |
|
multiple-point credit changes between design and constructionLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Keelan Kaiser on Sep 27, 2011, 9:42 am
What happens, hypothetically, when a EAc1 or EAc2 point calculation changes between the time a design credit is marked "anticipated" by the reviewer and the time final construction phase... Last reply: Manny Iglesia, Dec 5, 2011, 5:13 pm |
|
appeal alternatives when the reviewer makes a mistakeLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Keelan Kaiser on Oct 6, 2011, 5:02 pm
OK, reviewers probably don't make mistakes, but what can be done in situations where a denial has been issued, but the design team believes that there is an error in the clarification review and... Last reply: Manny Iglesia, Dec 5, 2011, 4:55 pm |