Topic | Recent |
---|---|
GSF not part of initial fit-out or alteration- PI form 2General forumsposted by Michael Dulcich on Jan 6, 2011, 3:06 pm
What is an example of GSF not part of an initial fit-out or an alteration? Would it include any of the core/exist mechanical spaces? Last reply: David Posada, Jan 11, 2011, 4:47 pm |
|
Edge guards for green roofsNC-2009 SSc7.2: Heat island effect - roofposted by Steve Cattaneo on Aug 2, 2010, 11:55 am
We are designing a low rise residence and the local building official believes we need guard rails an edges > 30'' above grade. We are providing anchor points for maintenance staff. Roof... Last reply: Susan Walter, Jan 11, 2011, 4:01 pm |
|
ClarificationPilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Alejandra Feliciano on Jan 11, 2011, 12:32 pm
Hello! I just want a very general clarification on the submittal requirements for this credit. Specifically, I'd like clarificaiton on the meaning of 'multi-parameter alternative product analysis... Last reply: Abena Darden, Jan 11, 2011, 3:18 pm |
|
Pilot Credits 5 & 6 Closing TodayPilot-Credits PC6: Integrative Project Planning & Designposted by Batya Metalitz on Jan 11, 2011, 11:50 am
As a reminder, this credit, and credit 5 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in... Last reply: Renee Shirey, Jan 11, 2011, 3:14 pm |
|
saving LOv3 formsGeneral forumsposted by Tristan Roberts on Jan 11, 2011, 3:02 pm
Your understanding on both points is correct. If you save the form, you can continue to edit it, until it's submitted for review. |
|
ASHRAE 62.1-2007 section 4CI-2009 IEQp1: Minimum indoor air quality performanceposted by G.J. Teunissen on Nov 10, 2010, 5:12 am
According to this section, a local survey is needed to document the local air quality. But even the... Last reply: G.J. Teunissen, Jan 11, 2011, 2:53 pm |
|
Pilot Credits 5 & 6 Closing TodayPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by Batya Metalitz on Jan 11, 2011, 11:49 am
As a reminder, this credit, and credit 6 will be closing at the end of today (1/11/2011). They will be replaced by Pilot Credit 42: Integrated Process, which is based on the credit currently in... Last reply: Joanna Rodriguez, Jan 11, 2011, 1:56 pm |
|
VAV System- LEED Online ventilation rate procedure?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on Jan 5, 2011, 7:50 am
Dear all, As I noticed, the LEED Online letter template for IEQ Prereq1 can not be used for... Last reply: Roger Chang, Jan 11, 2011, 1:13 pm |
|
IEQ p1 occupancy rates for ventilation in international settingsNC-2009 IEQp1: Minimum indoor air quality performanceposted by carol soares on Dec 10, 2010, 12:28 pm
Dears, Last reply: Roger Chang, Jan 11, 2011, 1:11 pm |
|
Pc5- PrelIminary Project PlanningPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by John Drigot on Oct 19, 2010, 4:35 pm
The LEED Pilot Credit Library Webinar I participated in today was long overdue and much appreciated. I applied for the Pilot Credit program back on 11/18/2009 and it took until 8/6/2010 before... Last reply: Teresa Cheung, Jan 11, 2011, 12:31 pm |