fuel cells and LEEDGeneral forumsposted by Tristan Roberts on Apr 22, 2011, 1:06 pm
K, the fuel cell could contribute to energy reductions which would have an impact on EAp2 and EAc1, but this would have to be modeled. The fuel cell itself... |
|
ID KioskNC-2009 IDc1: Innovation in Designposted by Joseph Blanco on Mar 29, 2011, 3:28 pm
If our project puts a Kiosk in the lobby showing a video of all the sustianable attributes of our project in addition to placing signs through out the building, would that count as two ID credits... Last reply: Jonathan Weiss, Apr 22, 2011, 9:43 am |
|
Exterior LED lightingCS-2009 SSc8: Light Pollution Reductionposted by BH . on Apr 22, 2011, 9:00 am
Hi, My first question consider project where investor want to use LED lights stripes (with a 3W input power each) on facade as light decoration. Is there any requirements which accept low... |
|
AHU vs FansNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Devani PERERA on Apr 21, 2011, 1:11 pm
Hello, Last reply: Tristan Roberts, Apr 21, 2011, 8:56 pm |
|
Project CostsCS-2009 MRc4: Recycled Contentposted by Sara Neff on Apr 21, 2011, 4:45 pm
Hello, I have a question about construction costs to calculate the... Last reply: Tristan Roberts, Apr 21, 2011, 8:54 pm |
|
Allowed exclusionsPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Frances Yang on Apr 20, 2011, 7:23 pmApril 21, 2011- 5:13 pm Pilot credits are intended to be much less formal than standard rating system credits. If you receive guidance or clarification via the LEEDuser forum or by emailing... Last reply: Batya Metalitz, Apr 21, 2011, 5:13 pm |
|
Any one, please comment onGeneral forumsposted by Bala Srini on Apr 20, 2011, 2:15 pm
Any one, please comment on this! Last reply: Bala Srini, Apr 21, 2011, 12:21 pm |
|
Prerinse spray valves & Water temperature temperingPilot-Credits WEpc18: Appliance and process water use reductionposted by Gabriele E. Bibee on Mar 1, 2011, 8:04 am
I am unable to get clarification on two requirements for this Pilot credit: Last reply: Batya Metalitz, Apr 21, 2011, 10:29 am |
|
Donated MaterialsSchools-2009 MRc5: Regional Materialsposted by Prudence Ferreira on Apr 20, 2011, 8:31 pm
A contractor has offered to donate a salvaged water tank to our project. The tank was salvaged locally so qualifies for the credit, but how do we calculate the cost for a donated item. Can we... Last reply: Nadav Malin, Apr 21, 2011, 2:55 am |
|
Sinks in a Massage & Wash RoomsCI-2009 WEp1: Water Use Reductionposted by Kirstin Weikert on Apr 20, 2011, 6:29 pm
Do sinks in Massage & Wash Rooms count in the WEp1 credit for LEED-CI? Currently, there is one massage room and one wash/dry room planned in my project. Both rooms include sinks. How would... Last reply: Tristan Roberts, Apr 20, 2011, 6:35 pm |