Log in
Forum
Topic

Recertify- post 5 years?

LEED Recertification: When and How
posted by Chris Munn on Feb 14, 2012, 11:18 am

According to the guidance I've seen from LEED, your performance period for recertification is from the time you were certified initially up until the time you submit for for recertification....

Last reply: Barry Giles, Feb 14, 2012, 11:42 am

Energy Star Scores- Easily Modified

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Michelle Bracewell-Musson on Feb 13, 2012, 1:09 pm

Hello Everyone,
I did a basic walkthrough and counted the computers and people for the Energy Star data calculations and some questions came up.

1.) It was a Friday, so I expect the...

Last reply: Dan Ackerstein, Feb 14, 2012, 10:58 am

ABSL-3 Baseline vs. Proposed Fan Energy for RTU

NC-2009 EAc1: Optimize Energy Performance
posted by Michael O'Brien on Feb 1, 2012, 4:50 pm

I've recently come across a deblitating problem as it pertains to the energy modeling of an ABSL-3 space. The sensitive, high-containment nature of these spaces predicates an essentially CAV,...

Last reply: Marcus Sheffer, Feb 14, 2012, 10:57 am

Excluding areas for healthcare

NC-2009 SSc8: Light Pollution Reduction
posted by Jaida Anderson-Lozano on Feb 14, 2012, 10:37 am

We are building a healthcare project and have registered our project as LEED for NC. We have a question concerning exterior lighting. In LEED Healthcare it states "Note: The following areas may...

ARI Certification for VRF equipment in LEED-NC 2009

NC-2009 EAp2: Minimum Energy Performance
posted by Mauricio Ramirez on Feb 10, 2012, 6:20 pm

Talking about a VRF HVAC system. Is it a mandatory requirement that the VRF condenser and evaporative units must be ARI Certified, according with the Standard 90.1-2007? They should be labeled...

Last reply: Marcus Sheffer, Feb 14, 2012, 10:26 am

Baseline Exhaust Fans vs. Proposed ERV

NC-2009 EAp2: Minimum Energy Performance
posted by Candice Rogers on Feb 10, 2012, 5:01 pm

I am modeling a building that directs all building exhaust through an energy recovery ventilator, including bathroom exhaust. Can I take credit in the baseline for the ERV exhaust fan since it...

Last reply: Marcus Sheffer, Feb 14, 2012, 10:24 am

Pressure Drop Adjustment when no HVAC has been designed

CS-2009 EAp2: Minimum Energy Performance
posted by Santiago Rodriguez on Feb 10, 2012, 6:40 am

Dear Forum,

I am modeling a building which has no heating or cooling system in the design, so, according to Appendix G, I have modeled these systems exactly the same as in the baseline...

Last reply: Marcus Sheffer, Feb 14, 2012, 10:09 am

Addition to Hospital with Shared HW and CHW Plant

NC-2009 EAc1: Optimize Energy Performance
posted by David Weigel, PE on Feb 8, 2012, 5:08 pm

I am working on a large (250,000 square-foot) addition to a 250,000 square-foot building, both are mixed-use but primarily hospital. We are simulating the addition as a separate building,...

Last reply: Marcus Sheffer, Feb 14, 2012, 9:58 am

Ashrae 90.1- Tradable Surfaces

CS-2009 EAp2: Minimum Energy Performance
posted by Angela Saggin on Feb 10, 2012, 8:55 am

Hi!

We have some canopies in our project, but one of these canopies is 5w over-lighted. It's our understanding that we can make it up by under-lighting other tradable surface.

Can...

Last reply: Marcus Sheffer, Feb 13, 2012, 2:59 pm

Reclaimed water and Health impacts

NC-2009 WEc1: Water Efficient Landscaping
posted by Susan Walter on Feb 8, 2012, 10:30 am

Our healthcare project is planning on capturing condensate water and excess rain water from a 12,000 s.f. vegetated roof in a cistern to irrigate plantings which include a small lawn area in a...

Last reply: Susan Walter, Feb 13, 2012, 2:18 pm