Log in
Forum
Topic

Sample form of LEED HC IEQ c2

LEED for Healthcare forum
posted by James Chueh on Feb 21, 2012, 12:23 am

Hi all,

When I look into the sample form downloaded from LEED ONLINE, the "Table IEQc2-4. Exterior Equipment" asks the maximum exterior equipment sound should be less than 55dBA.(The...

Office Space With 25% Data Center Changing to 100% Office-June

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Michelle Bracewell-Musson on Feb 13, 2012, 1:21 pm

There are four buildings that are leased by the State and one of the buildings currently has 25% if it as a Data Center. They will be removing the Data Center in June and I would like to know...

Last reply: Jenny Carney, Feb 20, 2012, 1:41 pm

Documentation for demonstrating the sanitary fixtures flow rate

CS-2009 WEp1: Water Use Reduction
posted by Caroline Ma on Oct 27, 2011, 11:34 pm

Regarding the documentation to demonstrate the sanitary fixtures flow rate, can we submit a test report conducted on-site which can demonstrate the exact flow rate of the sanitary fixtures in our...

Last reply: Nadia Ayala, Feb 20, 2012, 12:39 pm

Paint Stripper?

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Ellen Mitchell on Feb 20, 2012, 9:16 am

I have a contractor submittal asking if paint stripper/ remover should be included in this credit and I'm not sure how to answer. In reviewing the credit requirements and...

Last reply: Ellen Mitchell, Feb 20, 2012, 12:18 pm

paint paste

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Dario Ibarguengoitia on Feb 7, 2012, 5:13 pm

Which category should paint paste fall under?
How can I establish the...

Last reply: Mara Baum, Feb 20, 2012, 12:00 pm

LEED HC project with a basement-connected CUP building

General forums
posted by James Chueh on Jan 18, 2012, 2:11 am

We are doing a HC project that has two visually separate buildings, main clinic building and a CUP building, but these two buildings' basements are connected. We are thinking using...

Last reply: Scott Bowman, Feb 20, 2012, 11:58 am

Aerosol Coating Product (Spray Paint?)

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by John-David Hutchison, LEED AP BD+C, PMP on Feb 10, 2012, 2:41 pm

Has anyone found a definitive limit for spray paint - contractors often wonder what to use for marking paints.

Last reply: Mara Baum, Feb 20, 2012, 11:50 am

Interactive & Touch-Screen Displays

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Carly Ruggieri on Feb 17, 2012, 4:06 pm

A project of mine will be installing 70" interactive touch-screen wall mounted displays and tabletop (literally a screen with table legs) displays. The specified equipment is not ENERGY STAR, but...

Last reply: Carly Ruggieri, Feb 20, 2012, 9:33 am

Interior lighting

CS-2009 SSc8: Light Pollution Reduction
posted by Caroline Ma on Feb 20, 2012, 5:20 am

In our project, the interior lighting wiring is under tenant scope of work, however the provision of luminaires are under the project scope. So, do we still need to consider the interior lighting...

LEED for Homes Only?

Pilot-Credits PC9: Street Network
posted by Brooks Critchfield on Feb 18, 2012, 3:03 pm

Just to be clear--this is NO LONGER available to pursue as an ID Credit under LEED-NC v2009??

Thank you!

Last reply: Michael Miller, Feb 19, 2012, 11:44 pm