Log in
Forum
Topic

Walkable Streets- Historic

Pilot-Credits PC14: Walkable Streets
posted by Pat Thomas on Mar 22, 2012, 12:56 pm

Our project is an adaptive...

Last reply: Nicholas Harrell, Mar 23, 2012, 4:21 pm

Round-up

EBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
posted by SIG - Sustainability Main Account on Aug 25, 2011, 1:02 pm

I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks. The only reference to weeds I can find is that the best practice is to hand-pull-is that...

Last reply: SIG - Sustainability Main Account, Mar 23, 2012, 4:17 pm

'installed by substantial completion of construction'

Schools-2009 EAc2: On-Site Renewable Energy
posted by Sara Goenner Curlee on Mar 23, 2012, 12:05 pm

The letter template has a sign-off for the owner/agent to declare that the...

Last reply: Marcus Sheffer, Mar 23, 2012, 12:46 pm

LEED 2012 Should Be 2014

General forums
posted by Gary Shlifer MS, LEED AP BD+C, Homes on Mar 22, 2012, 6:04 pm

I am an advocate for raising the bar.
However, significant market buy-in has not occured. We need to stay at LEED 2009 levels for more than just 2 years. It should be more like 5. In this...

Last reply: Gary Shlifer MS, LEED AP BD+C, Homes, Mar 23, 2012, 12:37 pm

All indoor water is outside of project owner scope

CS-2009 WEp1: Water Use Reduction
posted by Mary Frances Stotler on Mar 23, 2012, 8:49 am

I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out. There are no public restrooms in...

Last reply: Curt Pascoe, Mar 23, 2012, 12:23 pm

Water Demand Calculator- Green Roof

LEED for Homes (LEED-H) Forum
posted by mary marcinko on Mar 7, 2012, 5:45 pm

I wanted to double check if anyone knows that a new green roof qualifies as a "landscaped area" for the LEED for Homes Credits SS2.5 and WE 2.3.

If we are adding an extensive green roof...

Last reply: Asa Foss, Mar 23, 2012, 12:07 pm

Rainwater Harvesting? (Rainwater Management Credit)

General forums
posted by Melissa Wrolstad on Mar 16, 2012, 5:50 pm

It is unclear whether or not...

Last reply: Scott Bowman, Mar 23, 2012, 11:30 am

Problems with ID&C

General forums
posted by Melissa Wrolstad on Mar 23, 2012, 10:43 am

The ID&C system is full of problems where credits have not been translated correctly from BD&C. In fact - the ID&C system refers to Healthcare projects 13 times and Schools projects...

Window to wall ratio

NC-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Mar 23, 2012, 3:52 am

I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated. There are small driver’s lounges in the garage building...

Last reply: Marcus Sheffer, Mar 23, 2012, 8:53 am

"Non-Structural" material/Interior walls

Pilot-Credits MRpc52: Material multi-attribute assessment
posted by stephanie fagan on Mar 22, 2012, 6:57 pm

Would metal framed interior walls need to be excluded from the calculations for this pilot credit?

Last reply: Keith Lindemulder, Mar 23, 2012, 8:52 am