Tenant's Access to BMS Room

CS-2009 EAc5.2: Measurement and verification - tenant submetering
posted by Maya Karkour on Dec 30, 2011, 11:05 am

Dear all,

We're developing an M&V Plan for a large commercial mall. Every tenant will be equipped with an electricity submeter, connected to the Mall's BMS.

The tenants will be...

Last reply: Emily Catacchio, May 8, 2012, 6:13 pm

PI Form 1, MPR 6, Option 1

General forums
posted by Jessica Hawley on Apr 25, 2012, 10:43 am

PI Form 1 states:
Note: The Data Release Form can be downloaded from the Credit Resources section of LEED Online. The Data Release Form must be on project owner letterhead, signed by the...

Last reply: Emily Catacchio, May 8, 2012, 6:03 pm

Apartment building- clarify air sealing and weatherstripping

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Kimberly Cullinane on Apr 24, 2012, 10:15 am

I am working with an apartment building that does include some smoking residential units and some nonsmoking units. Can we weatherstrip and seal and conduct blower door tests (using appropriate...

Last reply: Emily Catacchio, May 8, 2012, 5:34 pm

Required Signatory

CI-2009 EAp3: Fundamental Refrigerant Management
posted by SIG - Sustainability Main Account on Apr 24, 2012, 12:32 pm

I googled 'LEED CI Required Signatory' to identify a list to help me assign roles to team members (as admin).
Top result brought me back to LEEDOnline:
...

Last reply: Emily Catacchio, May 8, 2012, 5:30 pm

I recently stumbled upon a

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Chloe Bendistis on May 8, 2012, 5:15 pm

I recently stumbled upon a strange requirement for aerosol adhesives in the IEQ c4.1 credit form v2009 that is NOT listed in the addenda. The template states, "In the case of aerosol adhesives,...

White polyethylene SRI

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Guillermo T. Adamo on Sep 1, 2011, 6:16 pm

Hi,

We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70%...

Last reply: Jutta Berns, May 8, 2012, 4:32 pm

Timing of IAQ testing compliance

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Anders Olson on Apr 26, 2012, 3:57 pm

I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit. The retail requirements differ from the NC requirements in that projects...

Last reply: armando chamorro, May 8, 2012, 4:17 pm

Exemplary Performance

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Alexis Thompson on Apr 24, 2012, 11:26 am

What is the exemplary performance RCCT threshold? Reference Guide says 95%, LEEDOnline forms are built to indicate "Y" for exemplary performance at 95%, and LEEDUser says 95%, but there is an...

Last reply: Jenny Carney, May 8, 2012, 12:58 pm

Flushout calcs for Option 1 Path 1

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Mark Haynie on May 7, 2012, 5:52 pm

To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)? So if we have a total flush volume of 15,000,000 and the OA louver has a CFM...

Last reply: Dylan Connelly, May 8, 2012, 11:47 am

EAc1 ASHRAE 90.1-2007 Energy Simulation Model

NC-2009 EAc1: Optimize Energy Performance
posted by Denise Newbould on Mar 16, 2011, 5:13 pm

Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed? Since the engineer on our LEED...

Last reply: Marcus Sheffer, May 8, 2012, 10:24 am