Tenant's Access to BMS RoomCS-2009 EAc5.2: Measurement and verification - tenant submeteringposted by Maya Karkour on Dec 30, 2011, 11:05 am
Dear all, We're developing an M&V Plan for a large commercial mall. Every tenant will be equipped with an electricity submeter, connected to the Mall's BMS. The tenants will be... Last reply: Emily Catacchio, May 8, 2012, 6:13 pm |
|
PI Form 1, MPR 6, Option 1General forumsposted by Jessica Hawley on Apr 25, 2012, 10:43 am
PI Form 1 states: Last reply: Emily Catacchio, May 8, 2012, 6:03 pm |
|
Apartment building- clarify air sealing and weatherstrippingEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Kimberly Cullinane on Apr 24, 2012, 10:15 am
I am working with an apartment building that does include some smoking residential units and some nonsmoking units. Can we weatherstrip and seal and conduct blower door tests (using appropriate... Last reply: Emily Catacchio, May 8, 2012, 5:34 pm |
|
Required SignatoryCI-2009 EAp3: Fundamental Refrigerant Managementposted by SIG - Sustainability Main Account on Apr 24, 2012, 12:32 pm
I googled 'LEED CI Required Signatory' to identify a list to help me assign roles to team members (as admin). Last reply: Emily Catacchio, May 8, 2012, 5:30 pm |
|
I recently stumbled upon aNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Chloe Bendistis on May 8, 2012, 5:15 pm
I recently stumbled upon a strange requirement for aerosol adhesives in the IEQ c4.1 credit form v2009 that is NOT listed in the addenda. The template states, "In the case of aerosol adhesives,... |
|
White polyethylene SRINC-2009 SSc7.1: Heat island effect - nonroofposted by Guillermo T. Adamo on Sep 1, 2011, 6:16 pm
Hi, We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70%... Last reply: Jutta Berns, May 8, 2012, 4:32 pm |
|
Timing of IAQ testing complianceNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Anders Olson on Apr 26, 2012, 3:57 pm
I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit. The retail requirements differ from the NC requirements in that projects... Last reply: armando chamorro, May 8, 2012, 4:17 pm |
|
Exemplary PerformanceEBOM-2009 SSc4: Alternative Commuting Transportationposted by Alexis Thompson on Apr 24, 2012, 11:26 am
What is the exemplary performance RCCT threshold? Reference Guide says 95%, LEEDOnline forms are built to indicate "Y" for exemplary performance at 95%, and LEEDUser says 95%, but there is an... Last reply: Jenny Carney, May 8, 2012, 12:58 pm |
|
Flushout calcs for Option 1 Path 1NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Mark Haynie on May 7, 2012, 5:52 pm
To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)? So if we have a total flush volume of 15,000,000 and the OA louver has a CFM... Last reply: Dylan Connelly, May 8, 2012, 11:47 am |
|
EAc1 ASHRAE 90.1-2007 Energy Simulation ModelNC-2009 EAc1: Optimize Energy Performanceposted by Denise Newbould on Mar 16, 2011, 5:13 pm
Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed? Since the engineer on our LEED... Last reply: Marcus Sheffer, May 8, 2012, 10:24 am |