EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Peter Keithly on Apr 30, 2012, 4:17 am

We had to use the Case 2 calculator because our building was too small to qualify for an Energy Star rating. Can anyone tell me why using the LEED Case 2 calculator yields us 33 percentile points...

Last reply: Alexa Stone, May 8, 2012, 8:06 pm

Minimum % Reduction for Historical Data- Case 2?

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Kimberly Frith on May 1, 2012, 11:13 am

We see there are EAc1 points associated with reducing energy consumption as compared to historical building energy usage data for Case 2 projects that can't earn the Energy Star label, but it's...

Last reply: Alexa Stone, May 8, 2012, 8:01 pm

Documentation Tool Kit coming soon?

Schools-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Alison Y Rivenburgh on Sep 27, 2010, 12:43 pm

Would love to see some succesful examples of the designated carpool drop off area. From the above comments, it seems this is one requirement many are struggling with. Any chance you can have...

Last reply: Tristan Roberts, May 8, 2012, 7:34 pm

Maximum angle of incidence?

CI-2009 IEQc8.2: Daylight and views - views
posted by Jamie Brown on May 6, 2012, 7:53 pm

This question is a little difficult to describe in writing- is there a maximum angle of incidence from perimeter glazing for a “direct line of sight?” If you are directly in front of the window...

Last reply: Emily Catacchio, May 8, 2012, 7:28 pm

Unsure if LEED form is behaving correctly

EBOM-2009 SSc6: Stormwater Quantity Control
posted by Johanna Ofner on May 4, 2012, 5:13 pm

My project is pursuing Option 1, stormwater assessment report, of the Full documentation option of the O&M submittal path (what a mouthful!) of SSc6.
The site was designed to infiltrate...

Last reply: Emily Catacchio, May 8, 2012, 7:27 pm

MRc7

CI-2009 MRc7: Certified Wood
posted by Judy Chin on May 4, 2012, 11:01 am

Pyro-Guard Plywood (fired treated).
How should i document this for MRc7?
My co-worker says 100% for new...

Last reply: Emily Catacchio, May 8, 2012, 7:06 pm

Roof or Non-roof?

CS-2009 SSc7.2: Heat island effect - roof
posted by Katherine Ann Resurreccion on May 3, 2012, 5:16 am

Hi All,

We are working on a high-rise office project that will sit on top of an existing...

Last reply: Emily Catacchio, May 8, 2012, 6:58 pm

OATEY CLEAR PRIMER

CI-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Judy Chin on May 1, 2012, 2:51 pm

Do you know if the product is compliant with...

Last reply: Emily Catacchio, May 8, 2012, 6:41 pm

Low Mercury Lighting Systems?

Schools-2009 IDc1: Innovation in Design
posted by Michael Kros on May 1, 2012, 10:16 am

I've heard that under LEED v2.2 (and maybe under version 3.0 as well), you could achieve an ID Credit for installing low mercury lighting systems. Would this be possilbe to achieve under LEED...

Last reply: Emily Catacchio, May 8, 2012, 6:37 pm

Cabinetry

NC-2009 MRc4: Recycled Content
posted by Summer Gorder on Nov 29, 2010, 4:25 pm

If cabinetry is fabricated in a shop and then finished on-site, can it be considered rough carpentry, therefore be included in calculations without including all of the furnishing costs of the...

Last reply: Keith Lindemulder, May 8, 2012, 6:30 pm