My project is pursuing Option 1, stormwater assessment report, of the Full documentation option of the O&M submittal path (what a mouthful!) of SSc6.
The site was designed to infiltrate the stormwater volumes created by a 100 year storm, so has the capacity to infiltrate all volumes created by the 2 year storm.
I'm entering the same volumes into the "Two year, 24 hour design storm onsite rainfall volume" and the "Mitigated design storm rainfall volume." When I do this the calculator (Both on the downloadable form and the LEEDonline version) says that the site mitigates 1% of the design storm rainfall volume. It seems like this should read 100%.
Is this a bug or am I totally missing something?
Thanks!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Emily Catacchio
Sustainability SpecialistWight and Company
610 thumbs up
May 8, 2012 - 7:27 pm
Johanna,I haven't personally documented this credit in this way, but I would agree the form's response is puzzling. I would contact GBCI to get further clarification.