check with GBCIGeneral forumsposted by Tristan Roberts on Sep 8, 2010, 2:23 pm
I would recommend you check with... |
|
Blower Test with ASTM-779-03EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Ashu Gupta on Aug 7, 2010, 4:29 am
As per the LEED guide for residential or hospitality project blower test with... Last reply: Tristan Roberts, Sep 8, 2010, 2:03 pm |
|
LEED AP credential maintenanceGeneral forumsposted by Tristan Roberts on Sep 8, 2010, 12:27 pm
On your first question, I think there is a little confusion. The exams are for to to become a LEED accredited professional. |
|
Green roof insulation valueNC-2009 EAc1: Optimize Energy Performanceposted by Emmanuel Pauwels on Aug 26, 2010, 8:07 am
We are integrating an extensive green roof in the project (7 cm of substrate) with sedum vegetation. Is there a way we can take credit for the insulation value of the roof in the energy... Last reply: Mara Baum, Sep 8, 2010, 12:17 pm |
|
Public transit and military basesNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Lauren Ford on Sep 1, 2010, 11:03 am
I often work on military projects where they have one bus line to the nearest town/city, but not always a second route internal or external to the base. Troops are regularly transported by bus,... Last reply: Mara Baum, Sep 8, 2010, 11:55 am |
|
Water Source Heat PumpsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Jonathon Pfantz on Sep 8, 2010, 11:16 am
I have a small project where the existing system in a 10 story building is a water source heat pump system. From what I gather, this type of system is not very friendly towards achieving LEED CI... Last reply: Paul Conrad, Sep 8, 2010, 11:27 am |
|
Task Lamps exempt from Energy Star calculations?CI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Mason Radkoff on Sep 8, 2010, 10:15 am
We are purchasing task lamps to earn the IEQ 6.1 "Controllability of Systems - Lighting." The 2009 Commercial Interiors books states that "Excluded are HVAC, lighting, and building... Last reply: Paul Conrad, Sep 8, 2010, 11:24 am |
|
LEED-CS Multiple Building Energy ApproachCS-2009 EAc1: Optimize Energy Performanceposted by Edwin Wealend on Sep 7, 2010, 2:27 am
Hi does anyone have access to the potential LEED Multiple Building guideline for v3 projects, in particular the energy EA-1 ASHRAE requirements? We have a project at a critical stage and... Last reply: Christopher Schaffner, Sep 8, 2010, 11:12 am |
|
Are Occupancy Sensors alone sufficient?NC-2009 SSc8: Light Pollution Reductionposted by Matt Snyder on Sep 7, 2010, 9:30 pm
Question on LEED NC 2009 SSc8 - For Option #1 on the interior lighting portion, is having an occupancy sensor alone installed on fixtures that have a direct line of sight sufficient to meet this... |
|
ECOTECT and daylight calcs for LEED?NC-2009 IEQc8.1: Daylight and views - daylightposted by Xavier Obando on Feb 22, 2010, 5:13 pm
Can I use ECOTECT daylight reports to comply with this credit? Last reply: Eddy Santosa, Sep 7, 2010, 6:38 pm |