Topic | Recent |
---|---|
GreenhouseSchools-2009 EAc1: Optimize Energy Performanceposted by Lisa Logan on Jul 26, 2011, 12:40 pm
Client is adding greenhouse to the school project - sort of late in the game. Does this space get included in our energy calcs? I am assuming yes and that there is no way around it. Last reply: Marcus Sheffer, Jul 26, 2011, 5:03 pm |
|
Signage Details?NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Marketing Coordinator on Jun 1, 2011, 1:52 pm
Hi, I'm working on a LEED 2009 for Schools project and just rec'd my Design review comments. One of the comments was to "provide signage details to document how the spaces will be dedicated as... Last reply: Curt Pascoe, Jul 26, 2011, 3:04 pm |
|
Heat sensors to control HVACSchools-2009 EAc1: Optimize Energy Performanceposted by Gendel Metlitsky on Jun 13, 2011, 12:08 pm
On May, 26 I was listening to webinar regarding Richardsville NEZ school presented by Joanie Hendricks, Public Relations Coordinator from Warren County PS, Tim Murley Superintendent WCPS, Kenny... Last reply: Marcus Sheffer, Jul 26, 2011, 1:44 pm |
|
PIEACP compliance pathSchools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Peter Doo on Jun 13, 2011, 10:00 am
If we are using the PIEACP compliance path for this credit, the NC 2.2 Credit 4.3 refers only to carpet systems. Does this mean that other flooring systems, such as terrazzo for example, would be... Last reply: Lauren Sparandara, Jul 25, 2011, 8:38 pm |
|
DaylightingCI-2009 IEQc6.1: Controllability of systems - lightingposted by Sam Keehn on Jul 13, 2011, 6:35 am
Daylighting is mentioned as a method for meeting the credit requirement of a lighting control. Our project is an open plan with a small number of work stations all within 20 feet of the window... Last reply: Lauren Sparandara, Jul 25, 2011, 8:29 pm |
|
What about shared Multi-Occupant spaces that are not classrooms?Schools-2009 IEQc6.1: Controllability of systems - lightingposted by Grace Heicher on Jun 29, 2011, 3:33 pm
Following Case 1, the LEED Reference Guide requires individual lighting controls in spaces occupied by individuals, and also adjustable controls for all learning spaces. What about shared multi-... Last reply: Lauren Sparandara, Jul 25, 2011, 8:12 pm |
|
Can a restaurant achieve this credit?NC-2009 IEQc6.1: Controllability of systems - lightingposted by Wendy Shindledecker on May 27, 2011, 12:36 pm
I'm starting a new project on a bar and grill this is seeking LEED silver. I'm a little confused on how a restaurant would achieve this credit. The health department requires the kithen to have a... Last reply: Lauren Sparandara, Jul 25, 2011, 8:07 pm |
|
third-party verification of landfill diversion docs (re-post)NC-2009 MRc2: Construction Waste Managementposted by Jeff Jones on Jul 12, 2011, 2:30 pm
I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an... Last reply: Bradley Guy, Jul 25, 2011, 7:11 pm |
|
Zero Blowdown Technology for Cooling Towers- No ChemicalsEBOM-2009 WEc4: Cooling Tower Water Managementposted by Ashley Miele on Sep 23, 2010, 5:59 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up September 23, 2010- 7:03 pm Ashley, thanks for joining the forum. However, we're generally not wild about people posting here promoting their own services without at least adding some value in terms of tips on earning the credit, lessons learned, probing questions, or sample documentation. We're also not big fans of general statements about how many credits a technology can get that aren't backed up with specifics. Many such claims are very overblown (no pun intended... you know... Last reply: Michael Miller, Jul 25, 2011, 6:51 pm |
|
Pilot LEED Credit for verification of recyclingPilot-Credits PC43: Certified Productsposted by Jeff Jones on Jul 12, 2011, 2:08 pm
I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an... Last reply: Jeff Jones, Jul 25, 2011, 6:17 pm |