Topic | Recent |
---|---|
Alen A350 air purifierGeneral forumsposted by Tristan Roberts on May 19, 2010, 6:18 pm
Hi Karen! We recently got an Alen A350 to remove allergens from the air, and are fairly happy with it. What we like: Energy Star, lowest setting is very quiet, low filter replacement cost, has... Last reply: Robert Neil, Oct 4, 2011, 5:41 am |
|
Drawing the 1/2 Mile Radius for Community Connectivity CreditNC-2009 SSc2: Development Density and Community Connectivityposted by Joshua Bloom on Sep 26, 2011, 2:46 pm
I am trying to plot out the 10 community connectivity locations using either google maps or bing maps, and I am unable to draw a 1/2 mile radius circle to enclose the area. Does anyone know a... Last reply: Christian Sinai, Oct 3, 2011, 7:33 pm |
|
Building on parking spacesNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Tanja Arnesson on Oct 3, 2011, 3:50 am
Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces. Will... Last reply: Susan Walter, Oct 3, 2011, 4:32 pm |
|
acrylic textured coatingNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Dario Ibarguengoitia on Aug 12, 2011, 1:33 pm
How would I clasify an acrylic textured coating? Last reply: Dario Ibarguengoitia, Oct 3, 2011, 2:50 pm |
|
Credit CalculationsPilot-Credits PC19: Whole Building Reuseposted by Christine Robbins-Elrod on Oct 3, 2011, 12:28 pm
Hi, I'd like to verify if I have documented this Pilot Credit correctly? |
|
EAC1 Credit InformationNC-2009 EAc1: Optimize Energy Performanceposted by Sari Kujawa on Sep 21, 2011, 1:27 pm
Under the credit information website with "Credits, Credit Details, Points, Thresholds" listed. The Path is noted as "12% new/8% existing (1 pt) while our template form notes 10 points documented... Last reply: Sari Kujawa, Oct 3, 2011, 8:42 am |
|
ASHRAE 90.1 APPENDIX G Existing Building Model including shadingCS-2009 EAp2: Minimum Energy Performanceposted by Fabiano Castro on Sep 26, 2011, 4:56 pm
We are modelling a Major Renovation Project under the ASHRAE 90.1-2007 - APPENDIX G. The building existing conditions prior to this project renovation includes solar shading devices on all... Last reply: Marcus Sheffer, Oct 1, 2011, 12:32 pm |
|
Floor area calculatingNC-2009 IEQc8.1: Daylight and views - daylightposted by Mohamed Ravuthar, LEED AP, BD+C on Sep 27, 2011, 7:06 am
my question is how to calculate the sq ft area of the particular room to find out the window to floor ratio ?How to assume that the window area is covered this much area. Last reply: Eddy Santosa, Sep 30, 2011, 8:05 pm |
|
Record Time for ASHRAE appx G Simulation?CS-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Aug 11, 2011, 12:33 pm
What's your record time? What software did you use? Last reply: Marcus Sheffer, Sep 30, 2011, 8:04 pm |
|
Submit in Design review but include manuf. cuts in Const ReviewSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Renee Shirey on Sep 23, 2011, 1:19 pm
The prereq requires manufacturer cut sheets for the accoustic materials. This is a state funded project and we cannot single-source products - we must offer contractors at least 3 manufacturers... Last reply: David Posada, Sep 30, 2011, 4:47 pm |