4026 search results for "zero lot line"
Topic | Recent |
---|---|
Substantive revisionsGeneral forumsposted by Bill Swanson on Jul 26, 2012, 4:34 pmHernando Miranda Owner Soltierra LLC LEEDuser Basic Member 344 thumbs up July 26, 2012- 4:17 pm Bill, I am quite familiar with the Foundations Document. The original version was written with a lot of input from Rob Watson. He was the primary author. In my opinion, some of these changes are outside the scope of an of an addenda. When I was the vice-chair of the IEQ Technical Advisory Committee,... Last reply: Bill Swanson, Jan 8, 2013, 11:20 am |
|
Part 2 of the article does talk about v4General forumsposted by Nadav Malin on Oct 24, 2012, 8:41 pmin line with the PR campaign built up around “safety” and such shock tactics as gruesome drivers-ed class films. These campaigns have created regulation that mandates low-cost or common practice actions,... Last reply: Kathryn West, May 31, 2013, 3:17 pm |
|
Limit of water flow?NC-2009 WEp1: Water Use Reductionposted by Henrique Mendes on Apr 24, 2013, 11:46 amThanks a Lot Michelle, I´ll try to go back and upload a narrative. And regarding the review fase. It´s a final review. But it´s the first time they ask us about this prerequisite. I guess I´ll have to pay... Last reply: Henrique Mendes, Apr 26, 2013, 12:01 pm |
|
Interpretation #10202NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Ellen Mitchell on Apr 24, 2013, 4:40 pmfor the sake of being harder and is adding zero value from a sustainability standpoint. Log in or register to post comments Michelle Rosenberger Partner ArchEcology LEEDuser Premium Member 522 thumbs up July 11,... Last reply: Kris Phillips, Sep 23, 2013, 12:22 pm |
|
Summary 90.1- Naturally Ventilated with Radiant Floor HeatNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Jul 15, 2013, 6:14 amyou are purposely undersizing the base case so that it has as many unmet load hours as the proposed case. If you are expecting lots of unmet hours, why not just reduce the heating setpoint instead?... Last reply: Marcus Sheffer, Nov 1, 2013, 2:11 pm |
|
Reasonale Proof that a measure is not Standard PracticeGeneral forumsposted by Erika Duran on Apr 11, 2014, 10:37 amit prevents gaming the system. In reality it creates an advantage to people who certify a lot of projects and have a lot of experience with ID credits. (Please note that this is an explanation- it doesn't... Last reply: Hernando Miranda, Apr 11, 2014, 9:05 pm |
|
CxA Experience and energy systemsNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by André Harms on Jul 14, 2014, 10:07 amScott Bowman LEED Fellow Integrated Design + Energy Advisors, LLC LEEDuser Expert 519 thumbs up July 14, 2014- 10:28 am Lots of questions, so in order: I think that a CxA that has been working with a mentor on two projects, perhaps doing most of the hands on activities under the direction of the more experienced person, would be fine to then submit those two projects on a third to take on the role. No,... Last reply: Scott Bowman, Feb 11, 2015, 11:05 am |
|
LEED-NC and Interior FitoutNC-2009 MPR2: Must be a complete, permanent building or spaceposted by CT G on Jun 21, 2015, 2:46 pmBicknese Principal Hellmuth & Bicknese Architects LEEDuser Premium Member 21 thumbs up June 22, 2015- 1:56 pm Make sure you read CIR 10102 carefully and read between the lines. It took me a while... Last reply: FABIO VIERO, Apr 8, 2021, 9:36 am |
|
Electrical Commissioning ScopeNC-v4 EAp1: Fundamental commissioning and verificationposted by Renee Azerbegi on Sep 24, 2015, 6:25 pmof the above is focused on scope as required by LEED, but there are lots of very good reasons to do more extensive Cx for electrical distribution systems, especially in healthcare. But that is not the topic... Last reply: Scott Bowman, Mar 13, 2020, 12:45 pm |
|
University Campus ProjectNC-v4 LTc5: Access to quality transitposted by Michele Helou on Oct 10, 2016, 2:58 pmusual schedule). Might be worth a CIR if you can demonstrate zero weekend use, though. Log in or register to post comments Kristen Dotson Senior Program Manager, Sustainable Buildings, WWS Amazon LEEDuser... Last reply: emily reese moody, Apr 25, 2018, 2:11 pm |