Owner maintained carpet entry systems

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Susan Walter on Feb 10, 2011, 9:02 am

I have an in patient Hospital project and we are providing roof gardens and access to those gardens. Hooray for direct access to nature! My question in on the entryway systems. We want to encourage people to go outside so these are regularly used entries. Using dirt trapping entry systems in a patient care unit would be unacceptable for infection control so we are looking into carpeted mat systems. I can get the owner to agree to the weekly maintenance but since they clean their own buildings, could I get an exception in line with the schools exception? For the record, we're staying with NC...

Last reply: David Hubka, Mar 4, 2011, 9:55 am

EAp2 X Multiple Building

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Adriana Hansen on Mar 3, 2011, 4:49 pm

construction. Of the tree operating towers, only two of them are being certified. In this case, all the structure of external parking lots, landscaping, roads and grounds are shared with the four towers and will be 100% considered in the certification scope. Follow on the next lines a more detailed explanation of the situation and our questions about this case: 1)Eap2 – Minimum Energy Efficiency Performance...

Hazardous Waste

NC-2009 MRc2: Construction Waste Management
posted by Veronika Sundberg on Feb 15, 2011, 3:45 am

Sverige AB LEEDuser Basic Member 120 thumbs up March 1, 2011- 12:26 pm Thank you Valerie, then we will consider all of our Fluorescent lamps as hazardous waste, easiest. I would appreciate it a lot if you...

Last reply: Valerie Walsh, Mar 3, 2011, 3:47 pm

MERV Filter during and after Test run

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Yong Lee Low on Mar 3, 2011, 12:47 am

Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design LEEDuser Expert 646 thumbs up March 3, 2011- 9:34 am On the form for this credit, you will have to check a box that says: "Supply air systems, including both outside air and return air delivered as supply, serving all regularly occupied areas are sized to accommodate filtration media with a MERV rating of 13 or better. New filtration media which meet this MERV rating will be installed prior to occupancy." The strategy you are describing does not seem to be in line with honestly checking this box on the form,...

Last reply: Allison Beer McKenzie, Mar 3, 2011, 9:34 am

Energy Modelling For Standarg G

NC-2009 EAc1: Optimize Energy Performance
posted by Mauricio Ramirez on Mar 1, 2011, 6:08 pm

it will be very disspointing if this decission, which is major part of the design, and that will cost the client a lot, and it supplies a good thermal output, couldn't be modeled and rewarded by LEED points....

Last reply: David Hubka, Mar 2, 2011, 2:36 pm

Airport jetway re-use

CI-2009 MRc3.1: Materials Reuse
posted by Raphael Sperry on Feb 23, 2011, 6:41 pm

You'd also have to deduct any other assemblies that wouldn't easily fit within CSI divisions 2-10... wheels, tires, suspensions, and drive motors come to mind. It would be a lot of work, and still...

Last reply: Eric Shamp, Feb 27, 2011, 11:25 pm

Online Template Issue- Upload Time Required for IEQp1

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Shannon Allison on Feb 25, 2011, 8:52 pm

I have a technical question about LEED Online and inputting information into the Adobe Form for IEQp1. The issue I am having is the amount of time required to document a building that has several zones. Currently, the only way I know how to document IEQp1 is to actively enter each zone, line by line online. However, each time I input a value, the whole form pauses and I believe, re-calculates every value in the table. This pause greatly slows the process of inputting information and for buildings with well over 40 zones can increase our documentation time by several hours. Has anyone run...

Last reply: Roger Chang, Feb 26, 2011, 9:09 am

EAc1 Combined Heat & Power / Cogeneration

NC-2009 EAc1: Optimize Energy Performance
posted by Michael Heacock on Nov 6, 2009, 1:04 pm

Christopher Schaffner CEO & Founder The Green Engineer LEEDuser Expert 963 thumbs up February 8, 2010- 12:54 pm Harvard Green Campus has been posting all their LEED Documentation to a public website. Within this there are several projects connected to DES, although none are using microturbines. http://www.greencampus.harvard.edu/theresource/leed-submit/nc/ Lots of good examples there. Log in or register to post comments Michael Asaro Principal Delawie LEEDuser Basic Member 3 thumbs up February 22, 2011- 3:16 pm On a related subject- I have a new Combined Heat & Power project that is supplying/...

Last reply: Marcus Sheffer, Feb 25, 2011, 7:29 pm

i've been a usgbc employee for almost 9 years...

General forums
posted by brendan owens on Feb 9, 2011, 5:36 pm

so take this with as large a grain of salt as you think is required: i've been advised, repeatedly, that there's a perilously fine line between commenting on pending litigation and expressing thoughts about the state of our industry. i'm doing the latter- not the former. i consider myself somewhat of a connoisseur of leed criticism. my title is vp, leed technical development so lots of criticism about the way leed works comes my way. it might be the sheer volume of criticism i see but over the years i have to admit that i've become a bit of a snob about it. that said, some of the very...

Last reply: Bill Swanson, Feb 25, 2011, 4:02 pm

LEED Online Templates (BETA vs. Version3)

Schools-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Feb 23, 2011, 2:15 pm

Dear all, I am currently filling the LEED Online Letter templates. Some of these are BETA version. Until now, I am having no problems/bugs. It it possible that the USGBC asks to upgrade to the latest version 3? The issue is that it would take me a lot of time to re-fill all the BETA templates. Note that I noticed, for this EA Prerequisite form, that the v3 version asks for the HDD & CDD of the city/area, and also asks for 2 signatories of the Electrical Engineer AND Mechanical Engineer (as opposed to the BETA version, which asks for one signatory of who they call "Design Engineer"). Any...

Last reply: Tristan Roberts, Feb 25, 2011, 1:15 pm