New Equipment with or without 0.5lb of Refrigerant
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Rosenberger on
I have a project with a cafeteria that has a custom walk in cooler and a variety of refrigeration units.
District Energy Systems (DES) in LEED CI
CI-2009 EAp3:Fundamental Refrigerant Managementposted by James Lee on
Hi, I am working on LEED CI EAp3, and we have central chiller units out of project boundary. I saw the article saying "DES having no effect on any LEED CI EA prerequisite or credit". Does that mea
Existing Laboratory Equipment
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michele Helou on
Ok - consensus has been and reviewers have supported that existing base building HVAC and central plant systems are exempt from this prereq. Now, does anyone know if reused equipment - laboratory
Required Signatory
CI-2009 EAp3:Fundamental Refrigerant Managementposted by SIG - Sustainability Main Account on
I googled 'LEED CI Required Signatory' to identify a list to help me assign roles to team members (as admin). Top result brought me back to LEEDOnline: https://www.leedonline.com/irj/servlet/prt/po
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
Enhanced Refrigerant Mgmt as a Innovation Credit in LEED CI
CI-2009 EAp3:Fundamental Refrigerant Managementposted by R Jones on
As there is no Enhanced Refrigerant Management credit in LEED CI is it possible to pursue this under an Innovation in Design credit ?