CI-2009 SSc1:Site Selectionposted by Kristopher Croghan on
Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered.
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site Selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
SS 1 Option 2 Path 9
CI-2009 SSc1:Site Selectionposted by Augusto Velazquez on
I am having trouble filling out the LEED Online template for option 9.
Irrigation - Project Boundary
CI-2009 SSc1:Site Selectionposted by Alicia Freire on
Hi, I am working on a building located in a development in a business park with 4 buildings.
LEED Boundary for CI and SSc1
CI-2009 SSc1:Site Selectionposted by Maria Papiez on
My project is pursuing path 7 - water efficient landscaping - for SSc1. It is my assumption that our LEED Boundary should include the landscaped site as well as the building tenant space.
SS Cr1: Path 9-Innovative WasteWater Technologies
CI-2009 SSc1:Site Selectionposted by Sourabh Gupta on
In one of my project, they are attempting this point. While we have the water fixtures details & occupancy of the project space(tenant) only.
Option 1: Only LEED-CS?
CI-2009 SSc1:Site Selectionposted by Jeremy Poling on
I can't find official language further elaborating on what "flavors" of LEED Certified buildings qualify. Can a LEED-CI project going into a LEED-EB certified building earn this credit?
Tenant performance of base building improvements
CI-2009 SSc1:Site Selectionposted by Susan Di Giulio on
We have a client who is leasing two entire, adjacent buildings for 12 years. They are taking on installing high SRI roof membranes and a photovoltaic canopy system in the parking lot.
Storm water- Quality control
CI-2009 SSc1:Site Selectionposted by Sundararaj Subburaman on
If a project has rainwater recharge pits located throughout the site can the project consider this as an infilteration Basin as listed in BMP s?