Post a question or comment
Credit Filters
Performance Measurement—System-Level Metering
Filter by location
Forum
Topic
Replies
Recent

Tenant Electricity Meters

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Mitch Gascoyne  on 

Does anyone have any experience with tenant sub-metering and compliance with this credit?

1
Thu Feb 16, 2012, 10:33 pm

Tenant submetering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Gustavo De las Heras Izquierdo  on 

I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.

1
Mon May 2, 2016, 5:59 pm

Airflow metering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Tapio Peltonen  on 

Our project building has central air-handlers, which provide heating and cooling for the tenant spaces i.e. heating and cooling by air only.

1
Tue Oct 16, 2012, 1:02 pm

Minimum Performance Measuring Time

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Marina Andrade  on 

Greetings, We have a doubt about the credit EA C3.2 from LEED EB O&M. What is the minimum time to measure performance of the major’s building systems by the breakdown of energy?

1
Mon Feb 17, 2014, 7:39 pm

Instantaneous and/or totalized

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  James Gray  on 

For natural gas metering applications, is continuous logging of instantaneous flows a requirement? Most meters just put out totalized pulses, so I'm assuming that's fine... Any thoughts?

0

Performance period duration

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Charalampos Giannikopoulos  on 

The LEED Online form requests that “monthly and annual summaries of the metered energy usage for each of the subsystems”.

1
Mon Nov 30, 2015, 8:05 pm

Commercial Building with Tenant spaces fully submetered

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Energy Spectrum  on 

I am wondering if a commercial building, where over 90% of the building is submetered tenant space would qualify for this credit.

1
Thu Feb 16, 2012, 10:16 pm

Subsystem or End Use Type

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Ran Zhang  on 

On page 200 of the LEED-EB reference guide, Table 1- Sample Summary of Energy and Metering Capacity lists major energy-consumption subsystems and end-uses.

1
Mon Jan 25, 2016, 9:52 pm

Occupancy in the building

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Alberto Cardenas  on 

My question is if the occupancy of the building is a single person in this case of an institution and has no tenants can apply for this credit.

1
Mon Nov 30, 2015, 8:09 pm

Can gas metering only qualify for EAc3.2?

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  James Doyle  on 

Under LEED EBOM 2009 I am considering attempting metering under credit EAc3.2 for a 200,000 sq. ft.

1
Thu Nov 7, 2013, 8:42 pm