Forum quick links
LEED exam question
NC-2009 EAc2:On-Site Renewable Energyposted by Farah A. on
A project team is looking to pursue an ID credit on their new office building. The annual building energy cost for their 400,000 square foot project is $15,120.
Waste Heat Recovery Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear All:- we have two waste recovery boiler to fulfil the steam needed.
Eligibility of Wood
NC-2009 EAc2:On-Site Renewable Energyposted by Jens Apel on
This is a more general question about the eligibility of wood as renewable fuel. Following the Reference Guide I get the impression that all wood apart from untreated waste and mill residue is inel
Commissioning of PV system by different commissioning agent
NC-2009 EAc2:On-Site Renewable Energyposted by Deborah Lucking on
We have had this question come up a few times - the owner and the PV system supplier believe that it can be commissioned by a different commissioning agent.
PVs added after design submission
NC-2009 EAc2:On-Site Renewable Energyposted by Aliesa Adelman on
If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const
EAc2 criteria of the biogas
NC-2009 EAc2:On-Site Renewable Energyposted by Marcello Polverino on
Hello, I need the criteria of biogas outside of United States (Germany). Are ther requirements? Thank you > Marcello
Hello, regarding my previous
NC-2009 EAc2:On-Site Renewable Energyposted by Gabriele Polenta on
Hello, regarding my previous post I have one more doubt: having the building with a biomass system, in EAc1 when calculating the thermal energy do I have to use the local gas cost or the local biom
Jute Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear All:- In our project we have Jute boiler in our project with 2.0 Ton capacity This boiler utilizes the Jute scrap but the scrap is collect fro nearest jute making stations As per ID-10300
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.