"Performance Period" duration

EBOM-v4 WEp2:Building-level water metering
posted by  LEED Pro Consultant  on 

Hi, I want to know the performance period duration for the water efficiency prerequisite "Building-Level Water Metering". Thank you in advance,

3
Wed Feb 6, 2019, 1:37 am

Building Level Water Metering

EBOM-v4 WEp2:Building-level water metering
posted by  sebastian castañeda  on 

I have a doubt, we have a project of a complex of 3 buildings that is located inside a University Campus.

1
Tue Jan 17, 2017, 9:35 pm

Performance Period

EBOM-v4 WEp2:Building-level water metering
posted by  Matthew Hanks  on 

I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?

1
Tue Jun 23, 2015, 12:56 pm

Meter Declaration Requirements

EBOM-v4 WEp2:Building-level water metering
posted by  LEED Pro Consultant  on 

Are we exempt of providing the meter declaration if the water-meter has been installed by the water company (government)? What would the criteria for this be?

3
Mon Nov 24, 2014, 7:45 pm