Heat sensors to control HVAC
Schools-2009 EAc1:Optimize Energy Performanceposted by Gendel Metlitsky on
On May, 26 I was listening to webinar regarding Richardsville NEZ school presented by Joanie Hendricks, Public Relations Coordinator from Warren County PS, Tim Murley Superintendent WCPS, Kenny St
Electric Rates
Schools-2009 EAc1:Optimize Energy Performanceposted by Laura Long on
The electric company for our school project offers a rate structure which includes a lower rate for heat pumps.
EAC1 Existing Building Renovation Baseline Rotations Required?
Schools-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
Is it required in the EAC1 energy model to perform the baseline building rotations of 90, 180 and 270º for an existing building that is being renovated provided the building footprint and exterior
LEED for Schools 2007 EAc1 and LEED Boundary
Schools-2009 EAc1:Optimize Energy Performanceposted by Greg Hackett on
Our project contains a new LEED Building (addition) and Non-LEED Building (Existing, not in LEED Boundary).
EA Cr-1 - Process Energy Cost less than 25%
Schools-2009 EAc1:Optimize Energy Performanceposted by April McGee-Flournoy on
Project K-12 school, The enegry calculation done for the entire building but the process enegry cost comes less than 25%.
SSc8 and EAc1 Disconnect?
Schools-2009 EAc1:Optimize Energy Performanceposted by Amalia Hicks on
For LEED v3 (2009) SSc8 - Light Pollution Reduction, the baseline exterior lighting power allowance uses ASHRAE 90.1-2007 Addendum i (which has similar values to 90.1-2010).
Elevators (Lift/Escalators) & LEED EAC1 credit
Schools-2009 EAc1:Optimize Energy Performanceposted by Ameet AA on
Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method? I was told by an Elevator supplier that Regenerative Converter in lift could be