Ready Mix Concrete
CS-2009 MRc5:Regional Materialsposted by Ann E on
Hi,
Regarding the mentioned subject, is there/ what papers/certification is needed to submit by the RMC Supplier regarding LEED?
Thank you.
Soil used as filling material can count for MRc5?
CS-2009 MRc5:Regional Materialsposted by Alicia Villanueva on
Does the soil used as filling material for the construction can count for MRc5? It is permanently installed in the building, and the Reference Guide doesn´t mention it as in MRc2 where excavated so
product names in the Template
CS-2009 MRc5:Regional Materialsposted by Alicja Bieszyńska on
Does anyone know how detailed we should be when filling up the MRc5. Template's table? I mean, should I write "reinforcement steel", "steel beams", "steel railing" etc. or just "steel"?
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional Materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.
MR Calculator incorrect?
CS-2009 MRc5:Regional Materialsposted by Reid Middlebrooks on
It appears that the BDC Material and Resource Calculator (July 2012) provided under the credit resources incorrectly calculates the Regional Material percentage.
Racking system in warehouse
CS-2009 MRc5:Regional Materialsposted by Jean-Baptiste Noel on
In a C&S warehouse project, I was wondering whether the racking system could be counted in the materials list (as long as put consistently in all MR credits of course)? I am not including the f
Whose invoice is necesary?
CS-2009 MRc5:Regional Materialsposted by Michael E. Edmonds-Bauer on
We have a situation with a contractor and a manufacturer. There is one manufacturer of steel bars in Mexico. This manufacturer is selling steel bars to our "soil stabilization contractor". Becau
Regional- Additives Taken into Consideration?
CS-2009 MRc5:Regional Materialsposted by Roberto Meza on
I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp
Materials - Core & Shell
CS-2009 MRc5:Regional Materialsposted by Joaquim Lima on
Good morning! my project is classified as Core & Shell, I wonder if the calculations for credit 5 (Materials and Resources) should consider only the materials used in the common areas of the
Concrete Formwork
CS-2009 MRc5:Regional Materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!