Post a question or comment
Credit Filters
Must be a complete, permanent building or space
Filter by location
Forum
Topic
Replies
Recent

how long can be interval time between 2 parts of projects

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Catharina B  on 

Hello We are working on the project, which include 3 independent buildings: A, B & C – but for certification is one single building (each 17 stories above grade has own mechanic, energy system

0

AGMBC: Multiple Building and On-Campus Projects

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Tam Kin Hung  on 

Project brief: 1. The project is composed of 3 office buildings with retail podium for each of them, 1 residential building also with retail store surrounding it.

0

Core & Shell without HVAC or electrical systems

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Celia Puertas Romero  on 

We would like to pursue LEED Core & Shell certification for a building undergoing a major renovation.

0

Multiple Building or One Building?

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Muge Karasahin  on 

We have a large scale international project, consists of five attached building blocks (A-B-B1-B2-C) that share 7 basement and 7 ground up floors but each have different amount of total floor level

0

CS MPR2: reclaimed land without development previously

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Vivien Wong  on 

Dear Tristan, If a project is located in a reclaimed land which without previous development (i.e.: the project will be the first development in the reclaimed land), can still meet the requirement

0