If using porous paving, implement a plan to maintain its porosity. Vehicle use, sand and organic matter, and snowplowing can all damage or reduce the effectiveness of porous paving.
Implement a maintenance plan to ensure ongoing, as-designed performance of stormwater systems and equipment. Doing so will also contribute to LEED-EBOMSSc6: Stormwater Management credit compliance.
Maximize the value of the CxA’s 10-month visit by having the facilities personnel thoroughly prepare a detailed agenda developed in collaboration with the CxA.
Stagger equipment training to allow staff to become familiar with the systems. Make sure that this is reflected in contracts because typically the training is scheduled for same time to reduce the contractor’s presence on site. This stagger might delay the payment to the contractor and conflict with the contract, but provides the owner with a conformation of smooth operation