Commissioning supports a smooth transition from design into operations by avoiding future change orders. It ensures the equipment is installed per manufacturer’s instructions and aligned with the design intent. It reduces waste of energy and money due to incorrect control settings or system settings that aren’t fully optimized.
Project phase:
Credit tip type:
Image (Portrait):