LEED documentation and materials tracking are usually the GC’s responsibility even though specific materials selection may have been already determined by the architect or designer.
Installation of the M&V system should be fairly straightforward. Depending on the system and the experience of the subcontractors, however, specialized contractors may be needed.
The designer should review shop drawings and visit the site for installation inspection. This ensures that the fixtures have a cut-off for uplighting, the ballasts are as specified, and the controls are all included.