The contractor schedules any necessary air pressure or blower door tests in their proper sequence. Testing occurs at various construction phases and ideally with a test unit to identify any leakages and opportunities for improvement in other units.
A nonsmoking policy during construction is not required for this prerequisite, but it is a good idea for the contractor to adopt and enforce such a policy, particularly after the
Enhanced commissioning extends into the system startup phase, bridging the gap between design into the operations hand-over. Design and installation is only the first part of running an energy-efficient building. The real benefits are realized during operation.
LEED documentation can be submitted prior to the final commissioning report being completed, including verification of commissioned systems. A contract to complete these items is sufficient.