Streamline documentation and research by taking data gathered from subcontractors via the Environmental Materials Reporting Form and transfer it into a master spreadsheet for all the items being tracked for each product across MR and IEQ credits. For example, you may need to ask the millworker for rapidly renewable information for MRc6, certified
Research the availability of additional rapidly renewable materials before construction begins to ensure that the project earns this credit. If product decisions are made after construction begins, there may be less time to review data sheets carefully and much greater risk of using a noncompliant product.
Transfer all the data collected in the Materials Calculator spreadsheet (see Documentation Toolkit) to the LEED Online form and upload the product cut sheets.
Even if you use the default budget method for your baseline material budget, you have to break out the actual cost of materials you are tracking for LEED.
Breaking out specific materials costs (excluding labor) for construction materials that contribute to LEED credits is a requirement for LEED MR credits. Some subcontractors prefer not to do this because there are always hidden markups in the materials that subcontractors purchase at wholesale. However, you can simply include the product markup when breaking out a product’s material cost from installation and labor costs.
Assign a responsible party to input the subcontractors’ tracking forms into the Materials Calculator (see Documentation Toolkit). A LEED consultant or an administrative assistant in the GC’s office may be the best choice for this role.