If separation is occurring off-site at a mixed-debris processing plant, make sure the recycling facility can provide documentation for the amount of waste processed, by weight or by volume, as well as monthly recycling rate information, which is required for documentation purposes.
Keeping coffee cups and food waste out of recycling bins can be especially challenging. Use clear signage to prevent this and make it easy for food waste to be properly disposed of by providing trash cans clearly marked and in various locations on the site or at each building level.
If separation is occurring off-site, make sure recyclables are not contaminated with other garbage and wet waste. Provide separate containers for food waste and miscellaneous garbage and mark all containers clearly and prominently.
Consider fencing recycling areas, screening recycling and trash dumpsters from the public or locating them in an inconspicuous area. Neighborhood “use” of dumpsters to dispose of old mattresses and other furnishings is a problem that contractors deal with regularly, especially in cities where disposal of bulky items is expensive. On the other hand, in areas where there are limited resources for construction waste recycling, projects can stockpile
In cities where tipping fees are high, a lot of waste haulers separate waste automatically, just to avoid the fees, so contractors and subcontractors may have to source-separate onsite anyway.
The recycling coordinator tracks onsite waste recycling every month, or with every filled bin, to stay on track. The bins may fill at different times, depending on the material. Every time a bin is emptied and weighed, fill in the data on the tracking sheet.
Use signage to support the CWM plan—reminding subcontractors to sort waste appropriately. Post signs on the sorting bins, garbage cans, and throughout the site. Signs should include whatever languages are needed to communicate with workers on the jobsite.
A good CWM plan will include measures for waste prevention so that less waste is created in the first place. Consider requesting subcontractors to ask their vendors to use minimal or take-back packaging. As an incentive, specify that all subcontractors are responsible for returning pallets or recycling their packaging.