During the value engineering process, ensure that components critical to the daylight design, such as high-performance glazing and internal shading devices, are not removed from the project.
For Option 2, enter square footage of regularly occupied areas, and total area of regularly occupied space that meets the daylight requirements in the LEED Submittal Template. In addition, upload all required supporting documents to LEED Online.
Total the areas of regularly occupied spaces that have both direct-line-of-sight to perimeter glazing and access to views while seated (at 42”). Divide this value by the total area of regularly occupied spaces to confirm if the design provides greater than 90% of regularly occupied areas with access to views. This is done in the LEED Submittal Template. Upload plans and all required supporting documentation to LEED Online.