Include all lighting control locations and specifications in the drawings and bid documents, and develop floor plans indicating the location and type of lighting controls.
Complete your documentation on LEED Online. List each piece of equipment, with its rated power, and indicate if it is Energy Star labeled. The calculator built in to LEED Online automatically sums up the eligible wattage to confirm compliance and points achieved. If you prefer, you can upload your list, as long as it is in spreadsheet form and calculates the Energy Star labeled power percentage properly.
Once the construction documents are complete, update your equipment list to track any changes and confirm that specified equipment is included in final construction documents.
A CI tenant who leases the project space needs to sign in the required signatory box and provide an excerpt of the lease highlighting the ten-year agreement.