The design team and contractor may want to track specific product data sheets that could help with the curriculum. For example, the teachers might find it helpful to have the window specifications or the
Consider including a webcam to document construction activities for future use in a classroom, or using the energy model and building plans as teaching tools.
Ensure that specified HVAC systems and components match or exceed the efficiency requirements of the systems in the final, accepted energy model. Also, ensure that these systems, with their corresponding performance ratings, are included in the appropriate schedules and plans.
Ensure that your project is in compliance with all the prescriptive requirements outlined in the Advanced Buildings: Core Performance Guide, Sections 1.4, 2.9, and 3.10. Complete the prescriptive checklist, and collect equipment cut sheets.
Call out the efficiency ratings of selected equipment on mechanical equipment schedules to make sure that the proper model is selected and that the system is installed according to design intent.