ad-100000815
Replace the second sentence with the following:Building height is measured to eaves or the top of the roof for a flat-roof structure, and street width is measured fa
Replace the second sentence with the following:Building height is measured to eaves or the top of the roof for a flat-roof structure, and street width is measured fa
Replace the last sentence of requirement a with the following:If the public space is a square, park, or plaza, it must be at least 50 feet deep, measured at a point perpendicular to each entry.
Replace the second sentence with the following:Building height is measured to eaves or the top of the roof for a flat-roof structure, and street width is measured fa
In the header, change "(1 point)" to "(1 - 4 Points)"
In the paragraph beginning with "Ensure, through the results..." replace the word "testing" with "modeling".
In the first bullet, remove the extra space in "grill s"
In the fourth line of the paragraph, remove "/M-500"
Change title from "Sites without Affected Soils" to "Protected Soils Not Impacted"
Add the following bullet at the end of the page:
In both Option 1 and Option 2, in the last line of the first sentence, replace the text after "certifying bodies" with the following: that have either been accredited by an IAF accreditation body to, or could demonstrate compliance to, ISO 17021 or ISO/IEC Guide 65, and, when subsequently available, ISO/IEC 17065.