We have installed submeters on our building but the utility bill includes energy use from several other buildings located on the same campus. How do we reconcile this during the LEED review process?

For the LEED submission, provide a summary of submetered energy use for the project building along with the utility bills for the campus. Include a narrative summarizing the sub-metering approach and explaining the difference between the utility bills and the submetered energy use data included on Portfolio Manager, which commonly includes a spreadsheet showing the deductions from the total consumption used to show the energy attributable to the project, or how submeter readings for each separate entity add up to the whole reflected in the utility bills.

Our building includes heavy process loads that significantly increase the overall energy use in the building. If we submeter these loads, can we exclude this energy use for benchmarking purposes?

Process loads generally may not be excluded from the building’s energy use for benchmarking purposes. However, depending on the appropriate compliance path, you may be able to normalize the energy use from process loads based on the relative activity level of the building operations. For example, if the building is a manufacturing facility, part of the benchmarking process will involve normalizing energy use based on the relative output of the facility. Use of CIRs in the case of special benchmarking for buildings with process loads is recommended.

How long is an Energy Star label valid to use with a streamlined approach for Case 1?

In order to use an Energy Star label for the streamlined path, the Label must have been awarded within 12 months of the LEED application submittal date. For example, if you receive label award notification from Energy Star on March 5, 2012, you can use the score associated with the label as long as you submit your application to GBCI on or before March 5, 2013.

We have a building that consists of two attached structures and it’s unclear if we have to consider it a single building or if it should be certified as two separate buildings and benchmarked accordingly. How should we proceed?

In this case it is a good idea to (1) reach out to Energy Star directly to determine if the structures should be benchmarked as a single building or two and then (2) reference the LEED Supplemental Guidance to the Minimum Program Requirements. If it is still unclear after those two steps are taken, it’s also a good idea to communicate with USGBC directly to confirm the best approach.

I have a mixed-use building and am wondering if it is possible to pursue the prerequisite through Case 1. How do we proceed?

The first step is to enter the building and associated space characteristics on Portfolio Manager to see if the building is eligible for an Energy Star rating. If it is, you go with Case 1 and if not, go to the Case 2 calculator. Energy Star has published additional guidance for mixed-use buildings that is a great resource in this circumstance.

We have a number of buildings on a single campus that we would like to certify at the same time. Is it possible to benchmark the buildings at the campus level?

Generally, it is not possible to benchmark multiple buildings as a single entity on Portfolio Manager for Case 1 or for Case 2. Each building must be separately benchmarked as a standalone entity according to either Case 1 or Case 2 depending on the space type associated with each building. USGBC’s Application Guide for Multiple Buildings and On-Campus Projects is a good resource to reference in this type of scenario.

Our project didn't use some common adhesive types, and our LEED reviewer asked about this. Are we supposed to justify not using certain adhesives in our documentation?

No, but it might not hurt. Items commonly included in the credit are general construction adhesives, flooring adhesives, fire-stopping sealants, caulking, duct sealants, plumbing adhesives, and cove base adhesives. If your project doesn't report using one or more of these, your LEED reviewer might ask you to verify your list of documented items, to check that something wasn't inadvertently omitted.