ad-100001106

In alphabetical order, add the following definition for ancillary learning spaces, "Ancillary learning spaces are spaces where good communication is important to a student\'s educational progress but for which the primary educational functions are informal learning, social interaction or similar activity other than formal instruction.These areas include, but are not limited to, corridors, cafeterias, gymnasia, and indoor swimming pools."

100002036

Remove the first sentence from the first bullet under Step 5 :"Lamps must be purchased during the performance period for project teams to earn this credit."
Update "Required Documentation" section row three with the following: "List of purchased lamps, verifying compliance with the plan, or confirmation that no lamps were needed"

100002032

Step-by-Step Guidance:
Step 1, revise the last two sentences: Confirm that the selected program covers at least 40% of eligible cleaning equipment, by cost or quantity.The contract with the service provider must also include a phase-out plan for replacing noncompliant equipment at the end of its useful life with environmentally preferable products.
Step 3, revise the first sentence: With the information from the equipment inventory, calculate compliance with the credit requirements based on either equipment cost or quantity of items, using Equation 1.

100002047

Compliance Path 1. Prescriptive Achievement (Prerequisite Only), Step 2. Collect manufacturers’ information
Change the last sentence to read: “A plumbing fixture schedule is acceptable, provided it contains the fixture manufacturer, model, flush or flow rate information, and the WaterSense designation where applicable.”

100002049

Align the section with the text in the Prerequisite as follows:
"The World Meteorological Organization website (worldweather.wmo.int) and other sources provide annual precipitation data for many sites. If precipitation data for the project location are unavailable, they must be estimated.

100002048

Revise the second sentence to read: “If the spaces use different fixtures or have dramatically different patterns of occupancy or varying annual days of operation, complete the indoor water use calculator with a separate fixture group for each space type.”

100002043

1. Modify the first paragraph in Option 2. Air Testing so it reads: "Conduct baseline IAQ testing, after construction ends and within 14 days following occupancy, using testing protocols consistent with the EPA Compendium of Methods for the Determination of Air Pollutants in Indoor Air or as the ISO method listed in the table below. Testing must be done in accordance with one standard; project teams may not mix requirements from the EPA Compendium of Methods with ISO."